Laserfiche WebLink
5 of 12 <br />Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />65 <br />1 <br />4300 <br />SUPERSTRUCTURE <br />L.S. <br />$ 681,056 <br />$ 681,056 <br />$ - <br />$ - <br />$ 681,056 <br />66 <br />90 <br />4338 <br />EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTR. <br />L.F. <br />$ 125 <br />$ 11,250 <br />$ - <br />$ - <br />$ 11,250 <br />67 <br />110 <br />4456 <br />SCARIFYING CONC. SURFACE <br />S.Y. <br />$ 114 <br />$ 12,540 <br />$ - <br />$ - <br />$ 12,540 <br />68 <br />16 <br />4483 <br />PERMANENT GROUND ANCHOR <br />EACH <br />$ 5,000 <br />$ 80,000 <br />$ - <br />$ - <br />$ 80,000 <br />69 <br />16 <br />4484 <br />PERMANENT GROUND ANCHOR PERFORMANCE TEST <br />EACH <br />$ 2,000 <br />$ 32,000 <br />$ - <br />$ - <br />$ 32,000 <br />70 <br />1 <br />4485 <br />PERMANENT GROUND ANCHOR VERIFICATION TEST <br />L.S. <br />$ 10,000 <br />$ 10,000 <br />$ - <br />$ - <br />$ 10,000 <br />71 <br />87,710 <br />7006 <br />STRUCTURE EXCAVATION CLASS B INCL. HAUL <br />C.Y. <br />$ 24 <br />$ 2,105,040 <br />$ - <br />$ - <br />$ 2,105,040 <br />72 <br />78,190 <br />7008 <br />SHORING OR EXTRA EXCAVATION CLASS B <br />S.F. <br />$ 10 <br />$ 781,900 <br />$ - <br />$ - <br />$ 781,900 <br />73 <br />240 <br />5656 <br />BRIDGE APPROACH SLAB <br />S.Y. <br />$ 500 <br />$ 120,000 <br />$ - <br />$ - <br />$ 120,000 <br />74 <br />1 <br />XX-21 <br />PEDESTRIAN BRIDGE <br />L.S. <br />$ 283,206 <br />$ 283,206 <br />$ - <br />$ - <br />$ 283,206 <br />75 <br />950 <br />XX-22 <br />WALL FASCIA <br />CY <br />$ 1,150 <br />$ 1,092,622 <br />$ - <br />$ - <br />$ 1,092,622 <br />76 <br />188,880 <br />XX-23 <br />ST. REINFORCED FOR WALL FASCIA <br />LB <br />$ 1 <br />$ 226,656 <br />$ - <br />$ - <br />$ 226,656 <br />77 <br />1 <br />XX-25 <br />SHOOFLY BRIDGE <br />L.S. <br />$ 660,591 <br />$ 660,591 <br />$ - <br />$ - <br />$ 660,591 <br />78 <br />341,640 <br />XX-27 <br />ST. REINFORCED FOR SECANT CAP AND WALL <br />LB <br />$ 1 <br />$ 409,968 <br />$ - <br />$ - <br />$ 409,968 <br />79 <br />8,190 <br />XX-28 <br />ST. REINFORCED FOR WALL IMPROVEMENTS <br />LB <br />$ 1 <br />$ 9,828 <br />$ - <br />$ - <br />$ 9,828 <br />80 <br />12,130 <br />XX-29 <br />4 FT DIAM PRIMARY SHAFT <br />LF <br />$ 784 <br />$ 9,506,807 <br />$ - <br />$ - <br />$ 9,506,807 <br />81 <br />12,130 <br />XX-30 <br />4 FT DIAM SECONDARY SHAFT <br />LF <br />$ 514 <br />$ 6,231,707 <br />$ - <br />$ - <br />$ 6,231,707 <br />82 <br />66 <br />4160 <br />QA SHAFT TEST <br />EACH <br />$ 2,000 <br />$ 132,000 <br />$ - <br />$ - <br />$ 132,000 <br />83 <br />1 <br />XX-36 <br />TEMPORARY STRUTS <br />L.S. <br />$ 569,944 <br />$ 569,944 <br />$ - <br />$ - <br />$ 569,944 <br />STRUCTURE <br />$ 30,594,430 <br />$ - <br />$ - <br />$ 30,594,430 <br />STRUCTURE - BNSF ROW <br />84 <br />7,540 <br />4006 <br />STRUCTURE EXCAVATION CLASS A INCL. HAUL <br />C.Y. <br />$ 24 <br />$ 180,960 <br />$ - <br />$ - <br />$ 180,960 <br />85 <br />1 <br />4013 <br />SHORING OR EXTRA EXCAVATION CL. A <br />L.S. <br />$ 41,290 <br />$ 41,290 <br />$ - <br />$ - <br />$ 41,290 <br />86 <br />70 <br />XX-18 <br />PERVIOUS STRUCTURE BACKFILL <br />CY <br />$ 30 <br />$ 2,100 <br />$ - <br />$ - <br />$ 2,100 <br />87 <br />1 <br />4085 <br />FURNISHING AND DRIVING STEEL TEST PILE <br />EACH <br />$ 21,000 <br />$ 21,000 <br />$ - <br />$ - <br />$ 21,000 <br />88 <br />2,768 <br />4090 <br />FURNISHING ST. PILING <br />L.F. <br />$ 100 <br />$ 276,800 <br />$ - <br />$ - <br />$ 276,800 <br />89 <br />32 <br />4095 <br />DRIVING ST. PILE <br />EACH <br />$ 4,000 <br />$ 128,000 <br />$ - <br />$ - <br />$ 128,000 <br />90 <br />50 <br />4202 <br />CONC. CLASS 4000 FOR WALL IMPROVEMENTS <br />C.Y. <br />$ 400 <br />$ 20,000 <br />$ - <br />$ - <br />$ 20,000 <br />91 <br />1,940 <br />4204 <br />CONC. CLASS 4000W FOR SEAL <br />C.Y. <br />$ 155 <br />$ 301,610 <br />$ - <br />$ - <br />$ 301,610 <br />92 <br />80 <br />4456 <br />SCARIFYING CONC. SURFACE <br />S.Y. <br />$ 114 <br />$ 9,120 <br />$ - <br />$ - <br />$ 9,120 <br />93 <br />12 <br />4483 <br />PERMANENT GROUND ANCHOR <br />EACH <br />$ 5,000 <br />$ 60,000 <br />$ - <br />$ - <br />$ 60,000 <br />94 <br />12 <br />4484 <br />PERMANENT GROUND ANCHOR PERFORMANCE TEST <br />EACH <br />$ 2,000 <br />$ 24,000 <br />$ - <br />$ - <br />$ 24,000 <br />95 <br />32 <br />8376 <br />FURNISHING STEEL PILE TIP OR SHOE <br />EACH <br />$ 2,500 <br />$ 80,000 <br />$ - <br />$ - <br />$ 80,000 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />17 <br />