City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-11-13 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-11-13 Transportation and Infrastructure
>
TIC 2018-11-13 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:10 PM
Creation date
11/8/2018 9:34:11 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/13/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 of 12 <br />Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />WATERLINES <br />$ 14,198 <br />$ - <br />$ - <br />$ 14,198 <br />STRUCTURE <br />55 <br />160 <br />4049 <br />SHAFT - 36 IN. DIAMETER <br />L.F. <br />$ 200 <br />$ 32,000 <br />$ - <br />$ - <br />$ 32,000 <br />56 <br />460 <br />4053 <br />FURNISHING SOLDIER PILE <br />L.F. <br />$ 250 <br />$ 115,000 <br />$ - <br />$ - <br />$ 115,000 <br />57 <br />3,380 <br />4149 <br />ST. REINF. BAR FOR BRIDGE <br />LB. <br />$ 1 <br />$ 4,056 <br />$ - <br />$ - <br />$ 4,056 <br />58 <br />61,250 <br />4150 <br />ST. REINF. BAR FOR RETAINING WALL <br />LB. <br />$ 1 <br />$ 73,500 <br />$ - <br />$ - <br />$ 73,500 <br />59 <br />20 <br />4322 <br />CONC. CLASS 4000 FOR BRIDGE <br />C.Y. <br />$ 400 <br />$ 8,000 <br />$ - <br />$ - <br />$ 8,000 <br />60 <br />310 <br />4139 <br />CONC. CLASS 4000 FOR RETAINING WALL <br />C.Y. <br />$ 400 <br />$ 124,000 <br />$ - <br />$ - <br />$ 124,000 <br />61 <br />1,710 <br />4202 <br />CONC. CLASS 4000 FOR SECANT CAP & STEM WALL <br />C.Y. <br />$ 400 <br />$ 684,000 <br />$ - <br />$ - <br />$ 684,000 <br />62 <br />60 <br />4202 <br />CONC. CLASS 4000 FOR WALL IMPROVEMENTS <br />C.Y. <br />$ 400 <br />$ 24,000 <br />$ - <br />$ - <br />$ 24,000 <br />63 <br />38,270 <br />4204 <br />CONC. CLASS 4000W FOR SEAL <br />C.Y. <br />$ 169 <br />$ 6,466,108 <br />$ - <br />$ - <br />$ 6,466,108 <br />64 <br />2,370 <br />4299 <br />LAGGING <br />S.F. <br />$ 45 <br />$ 106,650 <br />$ - <br />$ - <br />$ 106,650 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.