Laserfiche WebLink
3 of 12 <br />Schedule A <br />Schedule A <br />Schedule B <br />Schedule C <br />Total <br />Std. Item <br />Item <br />Desc <br />No. <br />Unit <br />Dose <br />Dose <br />Dose <br />All Schedules <br />No. <br />Quantity <br />Item Description <br />Unit <br />Cost <br />Cost <br />Cost <br />Cost <br />DRAINAGE <br />31 <br />14,745 <br />7005 <br />STRUCTURE EXCAVATIONCLASSB <br />C.Y. <br />$ 17 <br />$ 250,665 <br />$ - <br />$ - <br />$ 250,665 <br />32 <br />3 <br />1063 <br />COMBINATION INLET <br />EACH <br />$ 1,410 <br />$ 4,230 <br />$ - <br />$ - <br />$ 4,230 <br />33 <br />10 <br />1075 <br />HEAVY LOOSE RIPRAP <br />TON <br />$ 70 <br />$ 700 <br />$ - <br />$ - <br />$ 700 <br />34 <br />1,792 <br />1161 <br />UNDERDRAIN PIPE 8 IN. DIAM. <br />L.F. <br />$ 12 <br />$ 21,504 <br />$ - <br />$ - <br />$ 21,504 <br />35 <br />1,848 <br />3016 <br />HIGH -DENSITY POLYETHYLENE (HDPE) PIPE 12 IN. DIAM. <br />L.F. <br />$ 32 <br />$ 59,136 <br />$ - <br />$ - <br />$ 59,136 <br />36 <br />29 <br />3017 <br />HIGH -DENSITY POLYETHYLENE (HDPE) PIPE 18 IN. DIAM. <br />L.F. <br />$ 38 <br />$ 1,102 <br />$ - <br />$ - <br />$ 1,102 <br />37 <br />835 <br />3018 <br />HIGH -DENSITY POLYETHYLENE (HDPE) PIPE 24 IN. DIAM. <br />L.F. <br />$ 263 <br />$ 219,605 <br />$ - <br />$ - <br />$ 219,605 <br />38 <br />36 <br />3091 <br />CATCH BASIN TYPE 1 <br />EACH <br />$ 1,653 <br />$ 59,508 <br />$ - <br />$ - <br />$ 59,508 <br />39 <br />13 <br />3105 <br />CATCH BASIN TYPE 2 48 IN. DIAM. <br />EACH <br />$ 3,760 <br />$ 48,880 <br />$ - <br />$ - <br />$ 48,880 <br />40 <br />1 <br />3107 <br />CATCH BASIN TYPE 2 72 IN. DIAM. <br />EACH <br />$ 5,763 <br />$ 5,763 <br />$ - <br />$ - <br />$ 5,763 <br />41 <br />1 <br />3109 <br />CATCH BASIN TYPE 2 60 IN. DIAM. <br />EACH <br />$ 4,975 <br />$ 4,975 <br />$ - <br />$ - <br />$ 4,975 <br />42 <br />788 <br />3869 <br />DUCTILE IRON PIPE FOR WATER MAIN 12 IN. DIAM. <br />L.F. <br />$ 60 <br />$ 47,280 <br />$ - <br />$ - <br />$ 47,280 <br />43 <br />226 <br />3872 <br />DUCTILE IRON PIPE FOR WATER MAIN 18 IN. DIAM. <br />L.F. <br />$ 410 <br />$ 92,660 <br />$ - <br />$ - <br />$ 92,660 <br />44 <br />13 <br />3874 <br />DUCTILE IRON PIPE FOR WATER MAIN 24 IN. DIAM. <br />L.F. <br />$ 92 <br />$ 1,196 <br />$ - <br />$ - <br />$ 1,196 <br />45 <br />70 <br />XX-04 <br />36" DIAM. CMP CULVERT PIPE <br />L.F. <br />$ 45 <br />$ 3,150 <br />$ - <br />$ - <br />$ 3,150 <br />46 <br />1 <br />XX-14 <br />GROUNDWATERPUMP <br />L.S. <br />$ 150,000 <br />$ 150,000 <br />$ - <br />$ - <br />$ 150,000 <br />47 <br />1 <br />XX-15 <br />EXPAND EXISTING PUMP STATION <br />L.S. <br />$ 500,000 <br />$ 500,000 <br />$ - <br />$ - <br />$ 500,000 <br />48 <br />1 <br />XX-19 <br />UPGRADE DETENTION POND <br />L.S. <br />$ 100,000 <br />$ 100,000 <br />$ - <br />$ - <br />$ 100,000 <br />49 <br />1 <br />XX-37 <br />SOUND TRANSIT STORM <br />L.S. <br />$ 30,000 <br />$ 30,000 <br />$ - <br />$ - <br />$ 30,000 <br />DRAINAGE <br />$ 1,600,354 <br />$ - <br />$ - <br />$ 1,600,354 <br />SANITARY SEWER <br />50 <br />379 <br />3767 <br />PVC SANITARY SEWER PIPE 8 IN. DIAM. <br />L.F. <br />40 <br />$ 15,160 <br />$ 15,160 <br />51 <br />1 <br />XX-20 <br />RELOCATE 36" SEWER <br />L.S. <br />$ 1,066,000 <br />$ 1,066,000 <br />$ 1,066,000 <br />SANITARY SEWER <br />$ 1,081,160 <br />$ 1,081,160 <br />WATER LINES <br />52 <br />3 <br />3850 <br />MOVING EXISTING HYDRANTS <br />EACH <br />$ 2,500 <br />$ 7,500 <br />$ - <br />$ - <br />$ 7,500 <br />53 <br />3 <br />3852 <br />RECONNECTING EXISTING HYDRANTS <br />EACH <br />$ 1,850 <br />$ 5,550 <br />$ - <br />$ - <br />$ 5,550 <br />SUBTOTAL <br />$ 13,050 <br />$ - <br />$ - <br />$ 13,050 <br />54 <br />1 <br />TAX <br />8.80% <br />$ 1,148 <br />$ - <br />$ - <br />$ 1,148 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />15 <br />