City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-11-13 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-11-13 Transportation and Infrastructure
>
TIC 2018-11-13 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:10 PM
Creation date
11/8/2018 9:34:11 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/13/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 of 12 <br />Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />GRADING - UPRR SHOOFLY <br />24 <br />6,321 <br />XX-01 <br />SUBBALLAST <br />TON <br />$ 21 <br />$ 132,741 <br />$ - <br />$ - <br />$ 132,741 <br />25 <br />345 <br />XX-02 <br />TEMPORARY SURCHARGE WALL BLOCK <br />EACH <br />$ 30 <br />$ 10,350 <br />$ - <br />$ - <br />$ 10,350 <br />26 <br />15,368 <br />XX-35 <br />GRAVEL BORROW INCL. HAUL SURCHARGE <br />TON <br />$ 23 <br />$ 353,464 <br />$ - <br />$ - <br />$ 353,464 <br />27 <br />33,322 <br />0431 <br />GRAVEL BORROW INCL. HAUL <br />TON <br />$ 23 <br />$ 766,406 <br />$ - <br />$ - <br />$ 766,406 <br />28 <br />7,415 <br />1086 <br />QUARRY SPALLS <br />TON <br />$ 16 <br />$ 118,640 <br />$ - <br />$ - <br />$ 118,640 <br />29 <br />120 <br />XX-24 <br />LIGHT WEIGHT FILL <br />CY <br />$ 150 <br />$ 18,000 <br />$ - <br />$ - <br />$ 18,000 <br />30 <br />1,100 <br />XX-33 <br />TEMPORARY SHOOFLY WALL <br />EACH <br />$ 30 <br />$ 33,000 <br />$ - <br />$ - <br />$ 33,000 <br />31 <br />15 <br />XX-29 <br />4 FT DIAM PRIMARY SHAFT <br />LF <br />$ 720 <br />$ 10,800 <br />$ - <br />$ - <br />$ 10,800 <br />32 <br />16 <br />XX-30 <br />4 FT DIAM SECONDARY SHAFT <br />LF <br />$ 450 <br />$ 7,200 <br />$ - <br />$ - <br />$ 7,200 <br />GRADING-UPRR SHOOFLY <br />$ 1,450,601.00 <br />$ - <br />$ - <br />$ 1,450,601.00 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.