Laserfiche WebLink
8 of 12 <br />Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />130 <br />6 <br />6766 <br />BEAM GUARDRAIL ANCHOR TYPE 10 <br />EACH <br />$ 1,000 <br />$ 6,000 <br />$ - <br />$ - <br />$ 6,000 <br />131 <br />15,430 <br />6806 <br />PAINT LINE <br />L.F. <br />$ 2 <br />$ 23,145 <br />$ - <br />$ - <br />$ 23,145 <br />132 <br />967 <br />6827 <br />PAINTED WIDE LANE LINE <br />L.F. <br />$ 0 <br />$ 338 <br />$ - <br />$ - <br />$ 338 <br />133 <br />26 <br />6833 <br />PLASTIC TRAFFIC ARROW <br />EACH <br />$ 255 <br />$ 6,630 <br />$ - <br />$ - <br />$ 6,630 <br />134 <br />950 <br />6857 <br />PLASTIC CROSSWALK LINE <br />S.F. <br />$ 14 <br />$ 13,300 <br />$ - <br />$ - <br />$ 13,300 <br />135 <br />279 <br />6859 <br />PLASTIC STOP LINE <br />L.F. <br />$ 10 <br />$ 2,790 <br />$ - <br />$ - <br />$ 2,790 <br />136 <br />1 <br />6890 <br />PERMANENT SIGNING <br />L.S. <br />$ 7,500 <br />$ 7,500 <br />$ - <br />$ - <br />$ 7,500 <br />137 <br />1 <br />6904 <br />ILLUMINATION SYSTEM <br />L.S. <br />$ 150,000 <br />$ 150,000 <br />$ - <br />$ - <br />$ 150,000 <br />138 <br />1 <br />6912 <br />TRAFFIC SIGNAL SYSTEM <br />L.S. <br />$ 893,268 <br />$ 893,268 <br />$ - <br />$ - <br />$ 893,268 <br />139 <br />105 <br />6915 <br />CASING <br />L.F. <br />$ 100 <br />$ 10,500 <br />$ - <br />$ - <br />$ 10,500 <br />140 <br />55 <br />6917 <br />DIRECTIONAL BORING <br />L.F. <br />$ 88 <br />$ 4,840 <br />$ - <br />$ - <br />$ 4,840 <br />141 <br />1 <br />6971 <br />PROJECT TEMPORARY TRAFFIC CONTROL <br />L.S. <br />$ 40,000 <br />$ 40,000 <br />$ - <br />$ - <br />$ 40,000 <br />142 <br />4 <br />7442 <br />PERMANENT IMPACT ATTENUATOR <br />EACH <br />$ 28,575 <br />$ 114,300 <br />$ - <br />$ - <br />$ 114,300 <br />143 <br />1 <br />XX-08 <br />PEDESTRIAN CONTROL AND PROTECTION <br />L.S. <br />$ 50,000 <br />$ 50,000 <br />$ - <br />$ - <br />$ 50,000 <br />TRAFFIC <br />$ 1,715,557 <br />$ - <br />$ - <br />$ 1,715,557 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />20 <br />