<br />Schedule A
<br />Schedule A
<br />Schedule B
<br />Schedule C
<br />Total
<br />Std. Item
<br />Item
<br />Desc
<br />No.
<br />Unit
<br />Dose
<br />Dose
<br />Dose
<br />All Schedules
<br />No.
<br />Quantity
<br />Item Description
<br />Unit
<br />Cost
<br />Cost
<br />Cost
<br />Cost
<br />OTHER ITEMS
<br />144
<br />434
<br />1945
<br />PEDESTRIAN HANDRAIL
<br />L.F.
<br />$ 200
<br />$ 86,800
<br />$ -
<br />$ -
<br />$ 86,800
<br />145
<br />34
<br />3110
<br />LOCKING SOLID METAL COVER AND FRAME FOR CATCH BASIN
<br />EACH
<br />$ 1,075
<br />$ 36,550
<br />$ -
<br />$ -
<br />$ 36,550
<br />146
<br />1
<br />7003
<br />TYPE B PROGRESS SCHEDULE
<br />L.S.
<br />$ 5,000
<br />$ 5,000
<br />$ -
<br />$ -
<br />$ 5,000
<br />147
<br />1
<br />7037
<br />STRUCTURE SURVEYING
<br />L.S.
<br />$ 25,000
<br />$ 25,000
<br />$ -
<br />$ -
<br />$ 25,000
<br />148
<br />1
<br />7038
<br />ROADWAY SURVEYING
<br />L.S.
<br />$ 10,000
<br />$ 10,000
<br />$ -
<br />$ -
<br />$ 10,000
<br />149
<br />6
<br />7041
<br />BOLLARD TYPE
<br />EACH
<br />$ 825
<br />$ 4,950
<br />$ -
<br />$ -
<br />$ 4,950
<br />150
<br />2,330
<br />7055
<br />CEMENT CONC. SIDEWALK
<br />S.Y.
<br />$ 46
<br />$ 107,180
<br />$ -
<br />$ -
<br />$ 107,180
<br />151
<br />5
<br />7058
<br />CEMENT CONC. CURB RAMP TYPE
<br />EACH
<br />$ 4,650
<br />$ 23,250
<br />$ -
<br />$ -
<br />$ 23,250
<br />152
<br />157
<br />7059
<br />CEMENT CONC. DRIVEWAY ENTRANCE TYPE
<br />S.Y.
<br />$ 104
<br />$ 16,328
<br />$ -
<br />$ -
<br />$ 16,328
<br />153
<br />990
<br />7060
<br />ASPHALT CONC. SIDEWALK
<br />S.Y.
<br />$ 83
<br />$ 82,170
<br />$ -
<br />$ -
<br />$ 82,170
<br />154
<br />1,035
<br />7083
<br />CHAIN LINK FENCE TYPE 3
<br />L.F.
<br />$ 17
<br />$ 17,078
<br />$ -
<br />$ -
<br />$ 17,078
<br />155
<br />3
<br />7103
<br />DOUBLE 14 FT. COATED CHAIN LINK GATE
<br />EACH
<br />$ 1,600
<br />$ 4,800
<br />$ -
<br />$ -
<br />$ 4,800
<br />156
<br />1
<br />7350
<br />CLEANING EXISTING DRAINAGE STRUCTURE
<br />L.S.
<br />$ 6,000
<br />$ 6,000
<br />$ -
<br />$ -
<br />$ 6,000
<br />157
<br />11
<br />7360
<br />MANHOLE 48 IN. DIAM. TYPE
<br />EACH
<br />$ 3,740
<br />$ 41,140
<br />$ -
<br />$ -
<br />$ 41,140
<br />158
<br />2
<br />7364
<br />MANHOLE 60 IN. DIAM. TYPE
<br />EACH
<br />$ 5,300
<br />$ 10,600
<br />$ -
<br />$ -
<br />$ 10,600
<br />159
<br />1
<br />7480
<br />ROADSIDE CLEANUP
<br />EST.
<br />$ 35,000
<br />$ 35,000
<br />$ -
<br />$ -
<br />$ 35,000
<br />160
<br />1
<br />7490
<br />TRIMMING AND CLEANUP
<br />L.S.
<br />$ 5,000
<br />$ 5,000
<br />$ -
<br />$ -
<br />$ 5,000
<br />161
<br />1
<br />7500
<br />FIELD OFFICE BUILDING
<br />L.S.
<br />$ 22,000
<br />$ 22,000
<br />$ -
<br />$ -
<br />$ 22,000
<br />162
<br />9,300
<br />7530
<br />CONSTRUCTION GEOTEXTILE FOR SEPARATION
<br />S.Y.
<br />$ 7
<br />$ 65,100
<br />$ -
<br />$ -
<br />$ 65,100
<br />163
<br />1,206
<br />7559
<br />GEOSYNTHETIC RETAINING WALL
<br />S.F.
<br />$ 15
<br />$ 18,090
<br />$ -
<br />$ -
<br />$ 18,090
<br />164
<br />402
<br />7567
<br />GRAVEL BORROW FOR STRUCTURAL EARTH WALL INCL. HAUL
<br />C.Y.
<br />$ 48
<br />$ 19,296
<br />$ -
<br />$ -
<br />$ 19,296
<br />165
<br />1
<br />7725
<br />REIMBURSEMENT FOR THIRD PARTY DAMAGE
<br />EST.
<br />$ 10,000
<br />$ 10,000
<br />$ -
<br />$ -
<br />$ 10,000
<br />166
<br />1
<br />7728
<br />MINOR CHANGE
<br />CALC
<br />$ 75,000
<br />$ 75,000
<br />$ -
<br />$ -
<br />$ 75,000
<br />167
<br />7731
<br />STEEL COST ADJUSTMENT
<br />CALC
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />$ -
<br />168
<br />1
<br />7736
<br />SPCC PLAN
<br />L.S.
<br />$ 2,000
<br />$ 2,000
<br />$ -
<br />$ -
<br />$ 2,000
<br />169
<br />7
<br />9605
<br />CONNECTION TO DRAINAGE STRUCTURE
<br />EACH
<br />$ 1,640
<br />$ 11,480
<br />$ -
<br />$ -
<br />$ 11,480
<br />170
<br />1
<br />01-07
<br />STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
<br />L.S.
<br />$ 20,000
<br />$ 20,000
<br />$ -
<br />$ -
<br />$ 20,000
<br />171
<br />1
<br />0I-11
<br />UTILITY POTHOLING
<br />L.S.
<br />$ 30,000
<br />$ 30,000
<br />$ -
<br />$ -
<br />$ 30,000
<br />172
<br />1
<br />XX-05
<br />DEWATERING SYSTEM
<br />L.S.
<br />$ 250,000
<br />$ 250,000
<br />$ -
<br />$ -
<br />$ 250,000
<br />173
<br />2
<br />XX-06
<br />ABANDONMENT OF MONITORING WELLS
<br />EACH
<br />$ 700
<br />$ 1,400
<br />$ -
<br />$ -
<br />$ 1,400
<br />174
<br />1
<br />XX-09
<br />SETTLEMENT MONITORING - SURVEY
<br />L.S.
<br />$ 10,000
<br />$ 10,000
<br />$ -
<br />$ -
<br />$ 10,000
<br />175
<br />26
<br />XX-10
<br />SETTLEMENT PLATES
<br />EACH
<br />$ 800
<br />$ 20,800
<br />$ -
<br />$ -
<br />$ 20,800
<br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018