Laserfiche WebLink
Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />176 <br />1 <br />XX-11 <br />PROJECT RED LINE DRAWINGS <br />L.S. <br />$ 2,000 <br />$ 2,000 <br />$ - <br />$ - <br />$ 2,000 <br />177 <br />1 <br />XX-12 <br />FIBER OPTIC RELOCATION - WEST SIDE <br />L.S. <br />$ 60,000 <br />$ 60,000 <br />$ - <br />$ - <br />$ 60,000 <br />178 <br />1 <br />XX-13 <br />FIBER OPTIC RELOCATION - EAST SIDE <br />L.S. <br />$ 130,000 <br />$ 130,000 <br />$ - <br />$ - <br />$ 130,000 <br />179 <br />1 <br />XX-31 <br />STORM BYPASS <br />EST. <br />$ 15,000 <br />$ 15,000 <br />$ - <br />$ - <br />$ 15,000 <br />180 <br />1 <br />XX-38 <br />RELOCATE BP GAS LINES <br />L.S. <br />$ 1,000,000 <br />$ 1,000,000 <br />$ - <br />$ - <br />$ 1,000,000 <br />OTHER ITEMS <br />$ 2,279,012 <br />$ - <br />$ - <br />$ 2,279,012 <br />Subtotal -Ex. Mobe <br />Mobilization <br />Subtotal <br />$ 49,106,521 <br />$ - <br />$ - <br />$ 49,106,521 <br />$ 8,681,105 <br />$ - <br />$ - <br />$ 8,681,105 <br />$ 57,787,626 <br />$ - <br />$ - <br />$ 57,787,626 <br />10 of 12 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />22 <br />