City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-11-13 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-11-13 Transportation and Infrastructure
>
TIC 2018-11-13 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:10 PM
Creation date
11/8/2018 9:34:11 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/13/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />176 <br />1 <br />XX-11 <br />PROJECT RED LINE DRAWINGS <br />L.S. <br />$ 2,000 <br />$ 2,000 <br />$ - <br />$ - <br />$ 2,000 <br />177 <br />1 <br />XX-12 <br />FIBER OPTIC RELOCATION - WEST SIDE <br />L.S. <br />$ 60,000 <br />$ 60,000 <br />$ - <br />$ - <br />$ 60,000 <br />178 <br />1 <br />XX-13 <br />FIBER OPTIC RELOCATION - EAST SIDE <br />L.S. <br />$ 130,000 <br />$ 130,000 <br />$ - <br />$ - <br />$ 130,000 <br />179 <br />1 <br />XX-31 <br />STORM BYPASS <br />EST. <br />$ 15,000 <br />$ 15,000 <br />$ - <br />$ - <br />$ 15,000 <br />180 <br />1 <br />XX-38 <br />RELOCATE BP GAS LINES <br />L.S. <br />$ 1,000,000 <br />$ 1,000,000 <br />$ - <br />$ - <br />$ 1,000,000 <br />OTHER ITEMS <br />$ 2,279,012 <br />$ - <br />$ - <br />$ 2,279,012 <br />Subtotal -Ex. Mobe <br />Mobilization <br />Subtotal <br />$ 49,106,521 <br />$ - <br />$ - <br />$ 49,106,521 <br />$ 8,681,105 <br />$ - <br />$ - <br />$ 8,681,105 <br />$ 57,787,626 <br />$ - <br />$ - <br />$ 57,787,626 <br />10 of 12 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.