Laserfiche WebLink
12 of 12 <br />Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />Estimated ROW & Easement (Misc. Properties) Costs <br />Estimated Engineering & Permitting Costs <br />Estimated Owner/Agency Design Engineering Costs <br />Estimated Construction Admin and Inspection Costs <br />Estimated Total Project Costs <br />$ 1,720,166 <br />$ 1,720,166 <br />$ 3,892,500 <br />$ 3,892,500 <br />$ 607,500 <br />$ 607,500 <br />$ 4,000,000.00 <br />$ 4,000,000 <br />$ 83,781,626 <br />$ 83,781,626 <br />ROW & EASEMENTS <br />1 <br />ROW Acquisition (Fast Food Restaurants) <br />EST. <br />$ 191,925 <br />$ - <br />$ - <br />$ 191,925 <br />1 <br />Permanent Easements (BP, KC Sewer, outfall, fast food driveways) <br />EST. <br />$ 447,000 <br />$ 447,000 <br />Temporary Construction Easements (BP, KC Sewer, outfall, fast food driveways) <br />EST. <br />$ 668,241 <br />$ 668,241 <br />1 <br />Estimated UPRR Perm & Temp Easements <br />EST. <br />$ 330,000 <br />$ - <br />$ - <br />$ 330,000 <br />1 <br />Estimated BNSF BP & KC Sewer Easements <br />EST. <br />$ 83,000 <br />$ - <br />$ - <br />$ 83,000 <br />Subto al - ROW & Easements <br />$ 1,720,166 <br />$ - <br />$ - <br />$ 1,720,166 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />24 <br />