Laserfiche WebLink
TUKWILA FIRE STATIONS <br />Weinstein A-I-U <br />FS52 Additional Services Summary, Amendment #2 <br />11/26/18 <br />FS52 MACC Calculation (per Lydig conceptual estimate of 8/23/18) <br />Total cost of work $8,996,885 <br />Admin Build -out $450,000 <br />-27% for CA phase -$121,500 <br />TOTAL $9, 325, 385 <br />Sub bonds 1.50% $139,881 <br />SUBTOTAL $9, 465, 266 <br />Design Contingency 10.00% $946,527 <br />SUBTOTAL $10, 411, 792 <br />L&M Escalation - January 2020 $460,310 <br />L&M Escalation - Early Start July 2019 $154,971 <br />SUBTOTAL $11, 027, 073 <br />CM Contingency 3,00% $330,812 <br />Neg. Support Services $300,000 <br />MACC TOTAL $11,657,886 <br />Basic Fee Change Fee Increase per MACC $213,762 <br />Reduced CA Fee -$10,000 <br />$203,762 <br />AS17 FS52 Drive -Through Added Drilling Hart Crowser $9,200 <br />WAU Mark-up $920 <br />TOTAL $10,120 <br />AS18b FS52 Additional Civil Scope LPD $15,000 <br />WAU Mark-up $1,500 <br />TOTAL $16,500 <br />TOTAL $230,382 <br />22 <br />