Laserfiche WebLink
Weinstein A+U <br />Tukwila Fire Stations <br />Fee Proposal <br />FS51 Fee Calculation <br />Amendment #2 <br />Baseline Building Area <br />Site Area <br />Project (MACC) per 8/15/18 Estimate <br />NE Base Service Per WA State Fee Schedule 2015 - Type "B" <br />Assumes a 15 Month Construction Period <br />Percent Fee <br />Total Base Fee b Phase <br />November 26, 2018 <br />BASIC SERVICES (Scope per State Fee Schedule Guidelines) <br />Description <br />Architectural <br />Consultant Budgets <br />Structural <br />Specifications <br />Mechanical, Plumbing & Fire Protection <br />Electrical, Fire Alarm and Lighting <br />Civil (Basic Scope) <br />BASIC PHASE' SUBTOTALS . <br />Firm <br />Weinstein AIU <br />Swenson Say Faget <br />Axt <br />Greenbusch <br />Travis Fitzmaurice <br />LPD <br />11,933 SF <br />+/-85,000 SF <br />$8,457,576 <br />8.23% <br />COMPLETE <br />18% <br />$125,291 <br />COMPLETE <br />25% <br />$174,015 <br />ee Summa <br />027,751 <br />Total Basic Fee = $650,496 <br />Total Extra Services = $355,131 <br />Total Reimbursable Allowar $22,124 <br />-ictai based <br />26% 2% 27 % 2% 100% Ja ;;us'; <br />$180,975 $13,921 $187,936 $13,921 $696,059 ri'-lev. <br />De i Construction Bidding+" Contract <br />Documents Negotiation Administration Close Ou <br />58,241 80,890 107,745 8,256 122,500 8,673 <br />12,996 18,050 16,718 1,286 17,361 1,286 <br />4,500 6,250 15,834 1,250 5,833 833 <br />18,057 25,079 22,732 1,749 23,606 1,749 <br />11,340 15,750 16,380 1,260 17,010 1,260 <br />1,084 1,506 1,566 120 1,626 120 <br />147,525 180,975 13,921, . _ 187,9.36 13;921 <br />TOTA <br />$386,305 <br />$67,697 <br />$34,500 <br />$92,972 <br />$63,000 <br />$6,022 <br />650496 <br />EXTRA SERVICES SUBTOTAL (See following page for detail) <br />$355,131 <br />REIMBURSABLES ALLOWANCE <br />Reimbursable allowance - Fixed Fee (2% of Total Fee) <br />SUBTOTAL WIWAU Multiplier 10%; <br />TOTAL FEE PROPOSAL <br />Previous Basic Fee Total <br />Delta <br />WAU <br />$20,113 <br />22124 <br />$932,433 <br />$95,318 <br />TFS_MainContractFeeRevision November18 FINAL <br />Printed: 11/26/2018 <br />