City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-02-20 Item 3C - Discussion - Proposed 2019 Small Drainage Program
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-02-20 Transportation and Infrastructure
>
TIC 2019-02-20 Item 3C - Discussion - Proposed 2019 Small Drainage Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:13 PM
Creation date
2/14/2019 1:35:59 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/20/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Priority <br />Ranking <br />Problem Statement <br />Project Description <br />Cost <br />3 <br />At the NE corner of 33`d Ave S. and S. 132"d, 3306 <br />S. 132"d manufactured home has 12" CMP/concrete <br />culvert tile pipe running through yard to manhole <br />under deck and then out to pond in neighbor's yard <br />then to 34tlive stream <br />Replace/re-route system, HPA needed. Approximately <br />125' of 12" pipe and two type I CBs needed. <br />Construction $ 40,000 <br />Eng/Cont 35% 12,687 <br />Total $52,687 <br />3 <br />38' Ave & S. 130tto dead end —Needs new drainage <br />system. Old mismatched pipe, deep ditches, steep <br />driveways. Water running into home on lower side of <br />road. <br />Install new 12" storm system with catch basins and <br />thickened edges to get water to new catch basins. <br />Approximately 470 ft. of 12" pipe and 8 Type I CBs <br />needed. <br />Construction $137,500 <br />Eng/Cont 25% 34.375 <br />Total $175,875 <br />4 <br />S. 150' creek outfall to catch basin on S. 150111(off <br />Macadam Road). Undersized inlet "debris plugs", south <br />of Baptist church. <br />Install new cone grate and Type 1I manhole. <br />Construction $ 25,000 <br />Eng/Cont 15% 3,750 <br />Total $ 28,750 <br />*Design completed in 2016 <br />4 <br />56`t' Ave S & S. 14151 to S. 139th problem area — Problem <br />ditch. Long berms need new drainage system to prevent <br />homes from being flooded. <br />Install approx. 600 feet of 12" storm main and (4-6) <br />catch basins from S. 141'to S. 139t. Fill ditch, both <br />sides of 56th Ave South. <br />Construction $165,000 <br />Eng/Cont 25% 41,250 <br />Total $206,250 <br />4 <br />S. 133`d & S. 134t — Clean rocks and other debris out of <br />30" CMP pipe on west branch of Southgate Creek. <br />Debris plugs low flow pipe, hard to keep clean. NPDES <br />issue and private property issue. <br />Construction <br />Eng/Cont 25% <br />Total <br />4 <br />West Valley Hwy at the CAT Rental Store — Railroad <br />tracks to the ditch. <br />Replace 650 feet of 12" pipe and install (5) Type I catch <br />basins. Crossing OK, need R-O-W survey. <br />Construction $175,000 <br />Eng/Cont 25% 43,750 <br />Total $218,750 <br />4 <br />S. 143' & Interurban Ave South — Problem ditch from <br />pipe on S 143`d to flapgate manhole on river. Almost <br />impossible to clean and is a maintenance headache. <br />Install approx. 500 feet of 36" storm main, (1) manhole <br />point to point and fill ditch to river. <br />Construction $125,000 <br />Eng/Cont 25% 31,250 <br />Total $156,250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.