Laserfiche WebLink
EXHIBIT A <br />VALLEY VIEW SEWER DISTRICT <br />42nd Avenue South Gravity Sewer Improvements <br />Cost Estimate <br />Engineer: RH2 Engineering, Inc. <br />Engineer's Estimate <br />Bid Item <br />Description <br />Unit <br />Quantity <br />Unit Price <br />Total <br />D1 <br />Traffic Control <br />LS <br />1 <br />$ 25,000 <br />$ 25,000 <br />D2 <br />Shoring & Trench Safety Systems <br />LF <br />433 <br />$ 2 <br />$ 866 <br />D3 <br />Temporary Erosion and Sedimentation Control <br />LS <br />1 <br />$ 7,000 <br />$ 7,000 <br />D4 <br />Dewatering <br />LS <br />1 <br />$ 2,000 <br />$ 2,000 <br />05 <br />Potholing ' <br />EA <br />5 <br />$ 900 <br />$ 4,500 <br />D6 <br />Landscape and Misc. Restoration <br />LS <br />1 <br />$ 7,000 <br />$ 7,000 <br />D7 <br />Gilliam Creek Temporary Gravity Wastewater Bypass <br />LS <br />1 <br />$ 9,500 <br />$ 9,500 <br />D8 <br />Other Temporary Wastewater Bypasses <br />LS <br />1 <br />$ 10,000 <br />$ 10,000 <br />D9 <br />60 -inch Saddle Manhole (E17 -77) <br />LS <br />1 <br />$ 7,000 <br />$ 7,000 <br />D10 <br />48 -inch Standard Manhole (F17 -21, F17 -22) <br />EA <br />2 <br />$ 7,000 <br />$ 14,000 <br />011 <br />72 -inch Standard Manhole with Extra Channeling Work (E17 -51) <br />LS <br />1 <br />$ 15,000 <br />$ 15,000 <br />D12 <br />72 -inch Standard Manhole (E17 -53) <br />LS <br />1 <br />$ 8,000 <br />$ 8,000 <br />D13 <br />60 -inch Shallow Manhole (E17 -76) <br />LS <br />1 <br />$ 7,000 <br />$ 7,000 <br />D14 <br />72 -inch Shallow Manhole (E17 -49, E17 -52) <br />EA <br />2 <br />$ 8,000 <br />$ 16,000 <br />015 <br />8 -inch SDR 35 PVC Pipe <br />LF <br />172 <br />$ 110 <br />$ 18,920 <br />D16 <br />8 -inch AWWA C900 DR 25 PVC Pipe <br />LF <br />45 <br />$ 120 <br />$ 5,400 <br />D17 <br />18 -inch SDR 35 PVC Pipe <br />LF <br />32 <br />$ 200 <br />$ 6,400 <br />D18 <br />30 -inch Class 52 Ductile Iron Pipe with Ceramic Epoxy Lining <br />LF <br />184 <br />$ 330 <br />$ 60,720 <br />D19 <br />Controlled Density Fill Pipe Encasement <br />CY <br />110 <br />$ 150 <br />$ 16,553 <br />D20 <br />Crushed Surfacing Top Course Compacted Trench Backfill <br />LF <br />1283 <br />$ 6 <br />$ 7,700 <br />D21 <br />Crushed Surfacing Base Course Compacted Trench Backfill <br />LF <br />1283 <br />$ 6 <br />$ 7,700 <br />D22 <br />Gilliam Creek Crossing Crushed Surfacing Top Course Compacted Trench Backfill <br />LF <br />995 <br />$ 6 <br />$ 5,970 <br />D23 <br />Foundation Material <br />TON <br />356 <br />$ 25 <br />$ 8,898 <br />D24 <br />Gravel Driveway Restoration <br />LS <br />1 <br />$ 1,400 <br />$ 1,400 <br />D25 <br />10 -inch HMA Patch with 8 -inch Crushed Rock Base <br />SY <br />144 <br />$ 60 <br />$ 8,613 <br />D26 <br />Record Drawings and Post - Construction Survey <br />LS <br />1 <br />$ 4,000 <br />$ 4,000 <br />Subtotal (Construction Costs) <br />$285,140 <br />WSST (9.5 %) <br />$27,088 <br />Total (Construction Costs w/ SST) <br />$312,228.57 <br />8% of Total (with SST) for Construction Phase Admin and Engineering Coordination <br />Estimated Subtotal 1 <br />20% of Subtotal 1 <br />Estimated Subtotal 2 <br />$24,978.29 <br />$337,206.85 <br />$67,441.37 <br />$404,648.23 <br />4/202011. 11:49 AM J: \Data \VSD \113 - 003 \01.120 Tukwila 40th to 42nd Ave S Wastewater Bypass \Cost Estimating \Tukwila ILA Cost estimate.xlsx <br />Page8of8 <br />