TIC 2019-05-07 Item 2B - Contract Amendment #2 - 2019 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-05-07 Transportation and Infrastructure
>
TIC 2019-05-07 Item 2B - Contract Amendment #2 - 2019 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
5/1/2019 12:13:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/07/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-2 <br />Construction Management <br />Services <br />Scope of Work <br />April 18, 2019 <br />City of Tukwila — 2019 Overlay <br />Program <br />This work will provide construction management services for the construction contract to complete the City <br />of Tukwila — 2019 Overlay Program. These services will include design support, project management, <br />documentation control, inspection, materials testing, and contract administration during the construction of <br />the project, as detailed below. KPG ("Consultant") will provide to the City of Tukwila ("City") construction <br />management services for the project. <br />A detailed scope for the Contract follows: <br />I. INTRODUCTION <br />The following scope of services and associated costs are based upon the assumptions outlined below. <br />General Assumptions: <br />• The proposed project team will include one part-time documentation control specialist, a part-time <br />resident engineer, a full-time inspector, project design staff as needed, and a sub -consultant to <br />provide services for materials testing. It is anticipated that full-time site observation will be required <br />for the entirety of the project, which includes night work on select sites. <br />• The level of service is based on a construction project duration of approximately 40 working days. <br />• KPG estimates a total project construction duration of 60 working days (12 weeks) including two <br />weeks for preconstruction service, eight weeks for construction services, and two weeks for project <br />closeout and record drawing preparation. No suspensions or stop work periods are anticipated during <br />this duration. <br />• It is anticipated that the KPG will develop the Record of Materials (ROM). This scope of services <br />provides the management of the ROM and scheduling of required materials testing respectively. <br />• It is anticipated that the City will review and execute the insurance, bonds, and the Construction <br />Contract. <br />• It is anticipated that the Contractor will do all public outreach, and ensure affected business and <br />residents are notified of impending contractor activities one week prior to work. <br />• The design engineers from KPG will be available during construction to answer questions during <br />construction and review RAM's, shop drawings, and answer RFI's as required. <br />City of Tukwila — 2019 Overlay Program <br />Construction Management Services <br />Scope of Work <br />Page 1 of 7 <br />KPG <br />Project Number 18161 <br />4/19/2019 <br />13 <br />