City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-05-07 Item 2B - Contract Amendment #2 - 2019 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-05-07 Transportation and Infrastructure
>
TIC 2019-05-07 Item 2B - Contract Amendment #2 - 2019 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
5/1/2019 12:13:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/07/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-2 <br />in accordance with laws, contracts, regulations, or City's expectations. <br />3.2 Substantial Completion: Upon substantial completion of work, coordinate with the City and <br />other affected agencies, to perform a project inspection and develop a comprehensive list of <br />deficiencies or 'punchlist' of items to be completed. A punchlist and Certificate of Substantial <br />Completion will be prepared by the Consultant and issued by the City. <br />3.3 Materials Testing: Coordinate the work of the materials testing technicians and testing <br />laboratories in the observation and testing of materials used in the construction; document and <br />evaluate results of testing; and address deficiencies. Frequency of testing shall be determined by <br />the resident engineer. <br />Deliverables <br />• Daily Construction Reports with project photos — submitted on a weekly basis <br />• Punch List, Certificate of Substantial Completion <br />• Review test reports for compliance <br />TASK 3.4 — CONSTRUCTION SERVICES — OFFICE <br />A. Document Control. Original documentation will be housed at the Consultant's office, and filed in <br />accordance with standard filing protocol. A copy of working files will be maintained in the field <br />office. <br />Document Control consists of: <br />• Final Estimate (Approving Authority File) <br />• Comparison of Preliminary and Final Quantities (Approving Authority File) <br />• Final Records (Approving Authority File) <br />• Record of Material Samples and Tests <br />• Affidavit of Wages Paid <br />• Release for the Protection of Property Owners and General Contractor <br />B. Project Coordination: Liaison with City, construction contractor, engineer, utilities and property <br />owners on a regular basis to discuss project issues and status. <br />C. Plan Interpretations: Provide technical interpretations of the drawings, specifications, and contract <br />documents, and evaluate requested deviations from the approved design or specifications. <br />Coordinate with City for resolution of issues involving scope, schedule, and/or budget changes. <br />D. Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, and <br />distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis. <br />E. Initial Schedule Review: Perform detailed schedule review of contractor provided CPM for <br />conformance with the contract documents. <br />F. Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum <br />items. Review the Contract Price allocations and verify that such allocations are made in <br />accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for <br />payment each month will be calculated with detailed data. <br />G. Monthly Pay Requests: Prepare monthly requests for payment, review with the City, contractor <br />and approve as permitted. Utilize City provided format for pay estimates, or Consultant format. <br />H. Monthly Schedule Review: At the monthly cutoff, review contractor's updated schedule and <br />compare with field -observed progress, as described in Section 1-08 of the Special Provisions. In <br />addition, perform schedule analysis on contractor provided CPM updates and review schedule for <br />City of Tukwila — 2019 Overlay Program <br />Construction Management Services <br />Scope of Work <br />Page 4 of 7 <br />KPG <br />Project Number 18161 <br />4/19/2019 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.