City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-05-07 Item 2B - Contract Amendment #2 - 2019 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-05-07 Transportation and Infrastructure
>
TIC 2019-05-07 Item 2B - Contract Amendment #2 - 2019 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
5/1/2019 12:13:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/07/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOUR AND FEE ESTIMATE <br />Project: City of Tukwila <br />2019 Overlay Program <br />Amendment No. 2 - Construction Services <br />EXHIBIT B-2 <br />• Architecture • <br />Landscape Architecture <br />• Civil Engineering • <br />e <br />Mat Mabar Hour Estimate <br />��` o <br />o u get <br />Task ;Description <br />.. .....:... <br />ni ...., <br />Sensor <br />En ineer, <br />.. 184.00 <br />Resid nt <br />, En sneer <br />..$ 1 5 00..: <br />Pro ec f <br />En meer <br />140 00 <br />Design <br />En ineer <br />$ `:117 t)0` <br />. <br />Etgnr \ <br />echnici <br />$ li}000 <br />Canst <br />ns ector` <br />$ 110 04: <br />Survey, <br />Crew) <br />9 6 00 <br />Document <br />:Specialist <br />$` 115 00 <br />Coast <br />Rdmm. <br />$ 85 00 <br />Bud et'° <br />1 - Management, Coordination, Administration (Estimated duration 12 weeks) <br />Weekly level of effort by Classification <br />2 <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2 <br />Preconstruction Budget Estimate <br />24 <br />24 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />24 <br />$ 9,456.00 <br />3 - Preconstruction Services (Estimated duration 2 weeks) <br />Weekly level of effort by Classification <br />Preconstruction Budget Estimate <br />0 <br />8 <br />8 <br />0 <br />0 <br />8 <br />0 <br />12 <br />4 <br />0 <br />16 <br />16 <br />0 <br />0 <br />16 <br />0 <br />24 <br />8 <br />4 - Construction Services (Estimated duration 8 weeks) <br />$ 9,440.00 <br />Weekly level of effort by Classification <br />4 <br />20 <br />16 <br />0 <br />0 <br />60 <br />0 <br />20 <br />8 <br />1 Construction Period Budget Estimate <br />32 <br />160 <br />128 <br />0 <br />0 <br />480 <br />0 <br />160 <br />64 <br />$ 120,448.00 <br />5 - Closeout/Record Dwg Services (Estimated duration 2 weeks) <br />Weekly level of effort by Classification <br />0 <br />16 <br />4 <br />8 <br />8 <br />24 <br />0 <br />16 <br />4 <br />Closeout / Record Dwg Budget Estimate <br />0 <br />32 <br />8 <br />16 <br />16 <br />48 <br />0 <br />32 <br />8 <br />$ 18,232.00 <br />Subtotal Labor <br />$ <br />Reimbursables & Subconsultants <br />Fammitnnlb <br />Total:Project Bu iget ` <br />Material Testing Allowance $ <br />Construction Vehicle Mileage $ <br />Miscellaneous - Repro, Field Supplies $ <br />20, 000.00 <br />1,000.00 <br />1,000.00 <br />,Reimbursable <br />AWL <br />.. .22,000:00 <br />$., ..,.,. 179576 00`;' <br />TOOTER <br />REIMPAZ <br />4/23/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.