City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-05-07 Item 2C - Contract Amendment #6 - 53rd Avenue South Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-05-07 Transportation and Infrastructure
>
TIC 2019-05-07 Item 2C - Contract Amendment #6 - 53rd Avenue South Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
5/1/2019 12:17:07 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/07/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-6 <br />The level of service is based on additional project duration of up to 105 working days per the <br />assumptions in the Background section of this scope of work. <br />KPG field staff will continue to perform day to day public outreach to ensure affected residents <br />are notified in advance of impending contractor activities. <br />The design engineers from KPG will be available during construction to answer questions during <br />construction and review RAMs, shop drawings, and answer RFIs. The engineer of record will be <br />available to provide background information on the design should it be necessary. <br />Services will be performed in accordance with the Contract plans & special provisions, WSDOT <br />Local Agency Guidelines ("LAG"), the WSDOT Construction Manual, and the client engineering <br />standards. <br />The franchise utilities will provide field inspection for all work surrounding the construction or <br />relocation of their utility systems not constructed by the Client's Contractor, if necessary. <br />Client/Field Office: The Contractor will provide a field office as required by the contract <br />documents. The Consultant's field staff shall have access to the field office. <br />HI. SCOPE OF WORK <br />The objective and purpose of this Construction Management Services Agreement is for the Consultant to <br />successfully deliver the construction of the Project to the client by ensuring that the improvements are <br />constructed in accordance with the approved Plans and Specifications, as may be amended or revised, <br />that all of the required Project documentation is accounted for, and ultimately that the client receives a <br />successful review by TIB at the end of the Project. <br />TASK 1— MANAGEMENT/COORDINATION/ADMINISTRATION <br />No additional funds are requested for this task. We have been able to mitigate the longer contract <br />duration and can continue to provide the services described in the original scope of work within the <br />previously authorized budget. <br />TASK 2 DESIGN SUPPORT <br />No additional funds are requested for this task. We have been able to mitigate the longer contract <br />duration and can continue to provide the services described in the original scope of work within the <br />previously authorized budget. <br />TASK 3 — PRECONSTRUCTION SERVICES <br />Work is complete, no additional funds are requested for this task. <br />City of Tukwila 53rd Ave S <br />Additional Construction Management Services <br />Scope of Work — Supplement 6 <br />Page 2 of 4 <br />KPG <br />Project #15085 <br />March 2019 <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.