City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-05-07 Item 2C - Contract Amendment #6 - 53rd Avenue South Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-05-07 Transportation and Infrastructure
>
TIC 2019-05-07 Item 2C - Contract Amendment #6 - 53rd Avenue South Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
5/1/2019 12:17:07 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/07/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 4 — CONSTRUCTION OBSERVATION <br />Construction Observation services will continue in accordance with the originalscopemfmnork. Additkonal| <br />observation time is required to achiieve physical com,pletion due to longer contract duration: <br />4.5The Consultant shall provide the services of one full-time inspector with necessary <br />engineering, and administrative support for on additional 105 xvnddng days as described in the <br />Background section of this scope ofwork,Part-time inspection is anticipated for certain, remaining <br />work elements, The budget is based on 40 hours/week full-time inspection and 20 hours/week part- <br />timeinspecdonforupto105vvorking days associated with change order and weather days, <br />Deliverables <br />wDaily Construction Reports with project photos—subnmittedomavveeWybasis <br />* Punch List, Certificate mf Substantial Completion <br />m Review test reports for cornp|iamce <br />TASK 5—CONSTRUCTION SERVICES —OFFICE <br />Construction Office services will continue in accorda!mce with the original scope of work. Additional time <br />is required to achiieve physical completion due to longer contract durat�ion: <br />5.27The Consultant shall provide the services of one part-time resident engineer and one part-time <br />documentation specialist with necessary oversight, engineering, and administrative support for an <br />additional lOS working days as described in the Background section ofthis scope of work. The <br />budget is based on 16 hours/week part-time resident engineer and JU hours/week part-time <br />documentation specialist. <br />Defiuerobles <br />* Submittal log <br />• RF|Log <br />* Completed Record ofMaterial for Material Certification <br />• Change {}rder(s) <br />• Change Management Log <br />*RFILog <br />wMinor ChangeOrder(s) <br />m Force Account Records <br />m Recorddravvings in electronic and hard copy format <br />TASK 6—SURVEY @&MATERIAL TESTNIG <br />No additional funds are requested for this task. We have been able to mitigate the longer contract <br />duration a:nd can continue to provide the services described in the od 'ma�| scope of work within the <br />previously authorized budget. <br />City ofTukwila S311 Ave <br />Additional Construction Management Services <br />Scope qfWork — Supplement 6 <br />Page 3 of 4 <br />KPG <br />Project #15085 <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.