Laserfiche WebLink
TASK 4 — CONSTRUCTION OBSERVATION <br />Construction Observation services will continue in accordance with the originalscopemfmnork. Additkonal| <br />observation time is required to achiieve physical com,pletion due to longer contract duration: <br />4.5The Consultant shall provide the services of one full-time inspector with necessary <br />engineering, and administrative support for on additional 105 xvnddng days as described in the <br />Background section of this scope ofwork,Part-time inspection is anticipated for certain, remaining <br />work elements, The budget is based on 40 hours/week full-time inspection and 20 hours/week part- <br />timeinspecdonforupto105vvorking days associated with change order and weather days, <br />Deliverables <br />wDaily Construction Reports with project photos—subnmittedomavveeWybasis <br />* Punch List, Certificate mf Substantial Completion <br />m Review test reports for cornp|iamce <br />TASK 5—CONSTRUCTION SERVICES —OFFICE <br />Construction Office services will continue in accorda!mce with the original scope of work. Additional time <br />is required to achiieve physical completion due to longer contract durat�ion: <br />5.27The Consultant shall provide the services of one part-time resident engineer and one part-time <br />documentation specialist with necessary oversight, engineering, and administrative support for an <br />additional lOS working days as described in the Background section ofthis scope of work. The <br />budget is based on 16 hours/week part-time resident engineer and JU hours/week part-time <br />documentation specialist. <br />Defiuerobles <br />* Submittal log <br />• RF|Log <br />* Completed Record ofMaterial for Material Certification <br />• Change {}rder(s) <br />• Change Management Log <br />*RFILog <br />wMinor ChangeOrder(s) <br />m Force Account Records <br />m Recorddravvings in electronic and hard copy format <br />TASK 6—SURVEY @&MATERIAL TESTNIG <br />No additional funds are requested for this task. We have been able to mitigate the longer contract <br />duration a:nd can continue to provide the services described in the od 'ma�| scope of work within the <br />previously authorized budget. <br />City ofTukwila S311 Ave <br />Additional Construction Management Services <br />Scope qfWork — Supplement 6 <br />Page 3 of 4 <br />KPG <br />Project #15085 <br />26 <br />