City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-05-07 Item 2C - Contract Amendment #6 - 53rd Avenue South Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-05-07 Transportation and Infrastructure
>
TIC 2019-05-07 Item 2C - Contract Amendment #6 - 53rd Avenue South Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:16 PM
Creation date
5/1/2019 12:17:07 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/07/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-6 <br />TASK 7-ADDITIONAL SERVICES <br />Additional services requested by the client, will be performed only when authorized by the client. <br />Authorization, toperform additional services will beinwriting, specifying the work to beperformed, and <br />basis of payment. Items such as Community Outreach (except as com:pleted on a day to day basis by the <br />inspector and resident engineer as described herein), Public Meetings, Ribbon Cutting Ceremony, claims <br />analysis, additional surveying, services during shutdown periods of non -working days, and services for <br />extended working days are examples of possible additional services, This fee is based on 340 working days <br />(two weeks prior toconstruction, 21Sworking day contract, 1O5additional d'aymper this supplement, and <br />two weeks for closeout, 8 hour days), additional extension of days will be approximately $3,000 per day., <br />City ofTukwila f3mAve f <br />Additional Construction Management Services <br />Scope 4fWork — Supplement 6 <br />Page 4 of 4 <br />KPG <br />Project #15085 <br />March 2019 <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.