Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2020 to 2025 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. <br />C. Project Title <br />D. Road Name or Number <br />F. Begin t End Termini <br />F. Project Description <br />\ <br />\ <br />B. STIP ID <br />ture ID <br />m <br />' <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17 <br />S 144th St Bridge Sidewalks <br />S 144th Street <br />51st Ave S to 53rd Ave S <br />Widen existing sidewalks on bridge over <br />\ <br />. <br />\ <br />5 between 51st Ave S and 53rd Ave S <br />\ <br />\ <br />\ <br />\\\ <br />06/10/19 <br />06/17/19 <br />28 <br />0.250 <br />No <br />Funding <br />o\\ \\\ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal <br />ds <br />-und <br />e <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2022 <br />SRTS <br />4\ <br />\\\ <br />0 <br />0 <br />443,000 <br />Totals <br />4000 <br />\ <br />0 <br />0 <br />443,000 <br />Expenditure Schedule <br />\„_, ��� <br />Phase <br />1st <br />2nd <br />3rd <br />5th <br />\.- o\ <br />PE <br />0 <br />0 <br />216,000 <br />...\-N- <br />IloV <br />\\\\\\\\\\\\\\ <br />Op 0 <br />Totals <br />0 <br />0 <br />216,000 <br />�17,000 <br />\�� <br />\\\O\\\\\\\\0 <br />Report Date: May 22, 2019 <br />Page 12 <br />