City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-06-04 Item 2D - Resolution - 2020-2025 Transportation Improvement Program
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2019 Transportation and Infrastrucutre Packets
>
2019-06-04 Transportation and Infrastructure
>
TIC 2019-06-04 Item 2D - Resolution - 2020-2025 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:18 PM
Creation date
5/31/2019 9:37:01 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/04/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2020 to 2025 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number \ <br />E. Begin &End Termini \ <br />F. Project Description \ ture ID <br />m <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />19 <br />\\\\\... \ <br />S 152nd Street Safe Routes to School <br />2 <br />S 152nd Street \\\\\\ <br />Tukwila International Blvd to 42nd Avenue S \ <br />Design and construct curb, gutter and sidewalks on both sides including widening <br />pavement width by 3 feet to construct on -street parking lane on north side of street. <br />06/10/19 <br />— <br />06/17/19 <br />05 <br />0.300 <br />No <br />Funding \\oo... \: <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal‘ds <br />to Fundje <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2022 <br />\\1\ <br />SR\ <br />243,000 <br />0 <br />243,000 <br />P <br />CN <br />2023 <br />0 <br />,N�� 2,584,000 <br />0 <br />2,584,000 <br />Totals <br />0 <br />\ <br />\ \\\\\\�\ 2,827,000 <br />0 <br />2,827,000 <br />Expenditure Schedule <br />\ \ \\I\ <br />Phase <br />1st <br />2nd <br />3rd <br />4th , <br />5th & 6th $\ <br />PE <br />0 <br />0 <br />243,000\ <br />0 <br />CN <br />0 <br />0 <br />0 <br />2,584,000 <br />Totals <br />0 <br />0 <br />243,000 <br />2,584,000 <br />�� <br />Report Date: May 22, 2019 <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.