City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-06-04 Item 2D - Resolution - 2020-2025 Transportation Improvement Program
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2019 Transportation and Infrastrucutre Packets
>
2019-06-04 Transportation and Infrastructure
>
TIC 2019-06-04 Item 2D - Resolution - 2020-2025 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:18 PM
Creation date
5/31/2019 9:37:01 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/04/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2020 to 2025 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. <br />C. Project Title <br />D. Road Name or Number \ <br />E. Begin &End Termini \ <br />F. Project Description \ <br />B. STIP ID <br />ture ID <br />m <br />to <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />16 <br />1276(007)�\\\\ " <br />\\ <br />Strander Blvd./SW 27th St Extension <br />Strander Blvd./SW 27th St Extension \\\ <br />West Valley Highway to Naches Ave <br />This project is Phase 3 of a multi -phase improvement that will connect Strander <br />Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in <br />Renton. This project will complete the design, right-of-way and construction phases <br />for the roadway segment between West Valley Hwy and Naches Ave. Project <br />components include a railroad bridge for the Union Pacific RR to provide grade <br />separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway <br />lanes rportion nnewtailb dgfortheInterrurbanTraiil(includingnnewtrailproject segment, a separated <br />wideningjoint-use <br />tStrander <br />Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal <br />serving the Tukwila Station, and storm drainage facilities. Current funding will <br />complete the preliminary engineering and right of way phases. Construction will be <br />funded as part of a future phase. <br />\ <br />59 <br />\ <br />\�� <br />\` <br />\\\t\ <br />06/10/19 <br />\\\\ <br />\\ <br />06/17/19 <br />01 <br />0.300 <br />DCE <br />Yes <br />Funding \\ \ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State F $! de <br />Mate Funds Local Funds <br />Total Funds <br />S <br />PE <br />2020 <br />STP <br />1,730,000 <br />6.\\ 270,000 <br />2,000,000 <br />S <br />RW <br />2020 <br />STP(UL) <br />1,487,000 <br />233,000 <br />1,720,000 <br />S <br />CN <br />2021 <br />FMSIB <br />5,000,000 <br />\ <br />\\� 0 <br />5,000,000 <br />S <br />CN <br />2021 <br />Discretionary <br />5,000,000 <br />JP 0 <br />0 <br />5,000,000 <br />P <br />CN <br />2021 <br />STP <br />4,760,000 <br />TIB <br />4P00,000 <br />0 <br />16,760,000 <br />P <br />CN <br />2021 <br />TIGER <br />25,000,000 <br />WSDOT\�24,518,000 <br />0 <br />49,518,000 <br />Totals <br />42,977,000 <br />36,518,000 <br />503,000 <br />79,998,000 <br />Report Date: May 22, 2019 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.