Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin End Termini \ <br />F. Project Description mat \ \ ure ID <br />= <br />0 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17\ <br />45 <br />40-42 Ave S (S 160 St - S 131 PL) \\\\ <br />\\\ <br />S 160th Street to S 131 st Place <br />Design and construct street improvements, underground aerial utilities, drainage, <br />sidewalks, bike facilities, and driveway adjustments <br />06/25/18 <br />\\\\ <br />07/02/18 <br />1938 <br />04 <br />C G O P S <br />TW <br />DCE <br />Yes <br />Funding\ \ \ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds\ - <br />St ono J d Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />CN <br />2019 <br />0 <br />U II <br />\ \ 0 <br />3,000,000 <br />3,000,000 <br />P <br />CN <br />2024 <br />0 <br />\\\N" <br />o \\`,,,, \\\\\\\\\ 0 <br />4,360,000 <br />4,360,000 <br />Totals <br />0\ <br />0 <br />7,360,000 <br />7,360,000 <br />Expenditure Schedule <br />\\ \\\"\\\ <br />4t1% <br />, th & 6th <br />Phase <br />1st <br />2nd <br />3rd <br />CN <br />3,000,000 <br />0 <br />0 <br />\\\\Q\\\\\\\\ 0 <br />Totals <br />3,000,000 <br />0 <br />0 <br />\\\0 <br />\Q* <br />Report Date: May 21, 2019 <br />Page 1 <br />