Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title \ <br />D. Road Name or Number <br />E. Begin & End Termini \ <br />\ <br />F. Project Description \ mature ID <br />= (D\\\ <br />0 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />08\�� <br />401 <br />42nd Ave S Bridge Replacement \ <br />42nd Ave S <br />\\\ <br />Interurban Avenue S to North Bridge <br />Design and construct a replacement structure for the existing S 42nd Ave bridge. \ 810970 <br />06/25/18 <br />07/02/18 <br />1938 <br />11 <br />C G P S T <br />W <br />0.060 <br />DCE <br />No <br />Funding \I\ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />FederaiPunds <br />��a and Cod <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2020 <br />BR <br />1 ,-Wt0\ <br />\ <br />O <br />0 <br />546,000 <br />2,100,000 <br />P <br />RW <br />2021 <br />BR <br />740,000 <br />\� �OO000' <br />0 <br />260,000 <br />1,000,000 <br />P <br />CN <br />2022 <br />BR <br />10,206,000 <br />\\\\\\1\ <br />0 <br />2,444,000 <br />12,650,000 <br />Totals <br />12,500 000 <br />O <br />�p <br />0 <br />3,250,000 <br />15,750,000 <br />Expenditure Schedule <br />O <br />\ -N' - <br />Phase <br />1st <br />2nd <br />3rd <br />4t}a\N, <br />th & 6th <br />PE <br />0 <br />1,600,000 <br />0 <br />000 <br />mR <br />RW <br />0 <br />0 <br />1,000,000 <br />\\\\\\ <br />\ I IP0 <br />CN <br />0 <br />0 <br />250,000 <br />6,250,04 <br />46,1b0 <br />Totals <br />0 <br />1,600,000 <br />1,250,000 <br />6,500,000 <br />6, l 00 <br />Report Date: May 21, 2019 <br />Page 2 <br />