Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />F. BeginEnd Termini \\ <br />F. Project Description \ mature ID <br />= <br />2 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />19\ <br />113 <br />46th Avenue Safe Routes to School <br />46th Avenue S \\\\\ <br />S 150th Street to S 144th Street '\\ \ \\ <br />Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, A\\\\\ <br />including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised <br />crosswalk across S 144th Street with RRFB. \\ <br />06/25/18 <br />\\\\ <br />07/02/18 <br />1938 <br />05 <br />0.370 <br />Yes <br />Funding \ \ -i '-\ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Fund, - <br />St ads oc <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2019 <br />0 <br />\' <br />�� 180,057 <br />\\\\\\\O <br />0 <br />180,057 <br />P <br />RW <br />2019 <br />0 <br />TS <br />v \� 232,000 <br />0 <br />232,000 <br />P <br />CN <br />2020 <br />0 <br />4 RTS <br />\\�\124,668 <br />0 <br />2,124,668 <br />Totals <br />0 <br />\\ <br />\\\\\\\ 6 725 <br />0 <br />2,536,725 <br />Expenditure Schedule <br />\\\ <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />� <br />\ <br />h & 6th <br />\\N- <br />PE <br />180,057 <br />0 <br />0 <br />\\\\Q\\\\\0 <br />\ <br />0 <br />RW <br />232,000 <br />0 <br />0 <br />\ <br />0 <br />CN <br />0 <br />2,124,668 <br />0 <br />0' <br />Totals <br />412,057 <br />2,124,668 <br />0 <br />0 <br />\ 0 <br />Report Date: May 21, 2019 <br />Page 3 <br />