Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />D. Project Title <br />D. Road Name or Number <br />E. Begin &End Termini <br />F. Project Description \ mature ID <br />= <br />0 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17\ <br />601 <br />3144th St <br />:::::::: <br />Design and construct urban residential street improvements that include curb, gutter, <br />sidewalk , illumination and undergrounding. Street portion will coordinate with Water, <br />Surface Water and Sewer capital improvement program projects. <br />06/25/18 <br />07/02/18 <br />1938 <br />04 <br />C G O P S <br />TW <br />0.420 <br />CE <br />Yes <br />Funding .--N��\ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Fun' <br />. <br />Sta ,,���� <br />_\tate Funds <br />Local Funds <br />Total Funds <br />S <br />CN <br />2019 <br />0 <br />2,274,365 <br />2,714,849 <br />4,989,214 <br />Totals <br />0 <br />\\.0 ���2,274,365 <br />2,714,849 <br />4,989,214 <br />Expenditure Schedule <br />N\ \�\ <br />Phase <br />1st <br />2nd <br />3rd <br />4th\ <br />5th & 6th <br />CN <br />4,101,249 <br />250,000 <br />0 <br />\\\\\\\\O\\ 0\\ 0 <br />\\\\\\ <br />Totals <br />4,101,249 <br />250,000 <br />0 <br />\\ 0 <br />\\1 <br />Report Date: May 21, 2019 <br />Page 4 <br />