Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title \ <br />D. Road Name or Number <br />F. BeginEnd Termini \ <br />\ <br />F. Project Description \ \ mature ID <br />= (D\\\ <br />0 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />14\\\ <br />731 <br />Annual Bridge Inspections and Repairs <br />Various City Street <br />to \ \ <br />Perform load ratings and bi-annual inspections as well as construct necessary <br />repairs and maintenance <br />06/25/18 <br />07/02/18 <br />1938 <br />06 <br />No <br />Funding 11 <br />\ \\ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />FederaiPunds <br />"' <br />�und Cod <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />ALL <br />2019 <br />\\\ <br />0 <br />\\ <br />0 <br />2,300,000 <br />2,300,000 <br />Totals <br />0 <br />- �OO000" <br />0 <br />2,300,000 <br />2,300,000 <br />Expenditure Schedule <br />\" -\\\ <br />Phase <br />1st <br />2nd <br />3rd <br />\\4th \ 5th <br />ALL <br />335,000 <br />335,000 <br />405,000000 <br />', <br />820,000 <br />Totals <br />335,000 <br />335,000 <br />405,000 <br />\- 05,000 <br />\ <br />82-�\ <br />Report Date: May 21, 2019 <br />Page 7 <br />