Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />\\\\ <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />A. PINIProject No. B. STIP ID <br />D. Project Title <br />D. Road Name or Number <br />\ <br />= <br />F. Begin t End Termini \ <br />F. Project Description \ \ mature ID <br />0 <br />16\�� <br />733 <br />06/25/18 <br />07/02/18 <br />1938 <br />06 <br />C G O P S <br />No <br />TW <br />Annual Overlay and Repair Program <br />Various City Streets \ \\ <br />to <br />Repair, rehabilitate, and overlay City streets as needed in an annual program <br />Funding I\I,� <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />FederaiPunds `1 "' o4\tiund Cod <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />ALL <br />2019 <br />\\\ 0 \\ <br />0 <br />10,870,000 <br />10,870,000 <br />Totals <br />0 \ �\\000"\ <br />0 <br />10,870,000 <br />10,870,000 <br />0 <br />Expenditure Schedule <br />\" 11k <br />Phase <br />1st <br />2nd <br />3rd <br />\\4th \ 5th <br />ALL <br />1,730,000 <br />1,740,000 <br />1,800,000 <br />\000 <br />\\\\\\\\\\\\p\\\\\ <br />3,850,000 <br />Totals <br />1,730,000 <br />1,740,000 <br />1,800,000 <br />850,000 <br />\ <br />\\\\\ <br />� <br />3'8 *- <br />Report Date: May 21, 2019 <br />Page 8 <br />