Laserfiche WebLink
Allentown/Duwamish/Foster Point Projects and Expenditures 1989 - 2019 <br />1989 Annexed into the City, took over Water District 25 and Fire District 1 Expenditures Project No. <br />56th Ave S Bridge to Foster Point <br />1993 King County Metro Sewer Capacity line <br />1994 EMW Water, served fire flow and water pressure in Allentown <br />Pave Pamela Dr, S 133rd St Overlay & Drainage, 56th Ave S Ped Path $ 129,000.00 <br />1996 Allentown Water/Sewer/SWM Sewer Phase I 7,500,000.00 W/S/SWM 96-WT01 <br />1996 Tukwila Community Center built 4,100,000.00 Buildings <br />1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S 500,000.00 Roads <br />1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place S 20,000.00 Surface Water <br />1998 1998 Small Drainage Project Site 5 - 43rd Ave S 40,000.00 Surface Water <br />1999 1999 Small Drainage Project Site 3 - S 129th St 20,000.00 Surface Water <br />2001 Duwamish Improvements Water & SWM 1,068,431.93 W/S/SWM 01-WT01 <br />Included sidewalks and No Parking, PWTF loan 2002 to 2021 <br />(Valley View spent $1,047,148.70 for a total of $2,115,580.63) <br />2005 2005 Small Drainage Project Site 1- 45th Ave S 60,000.00 Surface Water <br />2007 2007 Small Drainage Project Site 2 - S 116th St 100,000.00 Surface Water <br />2007 2007 Small Drainage Project Site 5 - 47th Ave S 150,000.00 Surface Water <br />2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II $ 2,274,384.47 Water <br />Sidewalks on 42nd Ave S and guardrail on river 5,431,368.81 Sewer 01-SW02 <br />1,071,541.38 Surface Water 01-DRO1 <br />$ 8,777,294.66 <br />2009 Allentown Storm Water Pump Station 421,129.00 Surface Water <br />2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S. 174,636.00 Surface Water <br />2011 2010-11 Small Drainage Project Site 6 - S 122nd St - Pipe Lining 94,800.00 Surface Water <br />2017 42nd Ave S Roadside Barriers (wood barrier along river) 192,531.95 Roads 91310301 <br />2015 Overlay and Repair on S 124th St 260,000.00 Roads <br />2014-2016 BNSF Intermodal Access Study 241,000.00 <br />2016-2018 S 1191j' St Ped Bridge (repair failing girder tops & non-skid deck) 120,000.00 Bridges <br />2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities 50,000.00 Bridges <br />2003-2018 Duwamish Hill Preserve <br />2006-2018 Duwamish Gardens <br />$ 411,000.00 <br />Subtotal $ 24,018,823.54 <br />3,673,915.33 Parks <br />5,611,661.02 Parks <br />Total with Parks $ 33,304,399.89 <br />90330109 <br />90630102 <br />W:\Shared Copy Only \ Gall \Neighborhood Projects 1989-2019 gl 030619.81,, <br />