Allentown/Duwamish/Foster Point Projects and Expenditures 1989 - 2019
<br />1989 Annexed into the City, took over Water District 25 and Fire District 1 Expenditures Project No.
<br />56th Ave S Bridge to Foster Point
<br />1993 King County Metro Sewer Capacity line
<br />1994 EMW Water, served fire flow and water pressure in Allentown
<br />Pave Pamela Dr, S 133rd St Overlay & Drainage, 56th Ave S Ped Path $ 129,000.00
<br />1996 Allentown Water/Sewer/SWM Sewer Phase I 7,500,000.00 W/S/SWM 96-WT01
<br />1996 Tukwila Community Center built 4,100,000.00 Buildings
<br />1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S 500,000.00 Roads
<br />1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place S 20,000.00 Surface Water
<br />1998 1998 Small Drainage Project Site 5 - 43rd Ave S 40,000.00 Surface Water
<br />1999 1999 Small Drainage Project Site 3 - S 129th St 20,000.00 Surface Water
<br />2001 Duwamish Improvements Water & SWM 1,068,431.93 W/S/SWM 01-WT01
<br />Included sidewalks and No Parking, PWTF loan 2002 to 2021
<br />(Valley View spent $1,047,148.70 for a total of $2,115,580.63)
<br />2005 2005 Small Drainage Project Site 1- 45th Ave S 60,000.00 Surface Water
<br />2007 2007 Small Drainage Project Site 2 - S 116th St 100,000.00 Surface Water
<br />2007 2007 Small Drainage Project Site 5 - 47th Ave S 150,000.00 Surface Water
<br />2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II $ 2,274,384.47 Water
<br />Sidewalks on 42nd Ave S and guardrail on river 5,431,368.81 Sewer 01-SW02
<br />1,071,541.38 Surface Water 01-DRO1
<br />$ 8,777,294.66
<br />2009 Allentown Storm Water Pump Station 421,129.00 Surface Water
<br />2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S. 174,636.00 Surface Water
<br />2011 2010-11 Small Drainage Project Site 6 - S 122nd St - Pipe Lining 94,800.00 Surface Water
<br />2017 42nd Ave S Roadside Barriers (wood barrier along river) 192,531.95 Roads 91310301
<br />2015 Overlay and Repair on S 124th St 260,000.00 Roads
<br />2014-2016 BNSF Intermodal Access Study 241,000.00
<br />2016-2018 S 1191j' St Ped Bridge (repair failing girder tops & non-skid deck) 120,000.00 Bridges
<br />2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities 50,000.00 Bridges
<br />2003-2018 Duwamish Hill Preserve
<br />2006-2018 Duwamish Gardens
<br />$ 411,000.00
<br />Subtotal $ 24,018,823.54
<br />3,673,915.33 Parks
<br />5,611,661.02 Parks
<br />Total with Parks $ 33,304,399.89
<br />90330109
<br />90630102
<br />W:\Shared Copy Only \ Gall \Neighborhood Projects 1989-2019 gl 030619.81,,