City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-08-20 Handout Distributed at Meeting - 1989-2019 Allentown / Duwamish / Foster Point Projects and Expenditures
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-08-20 Transportation and Infrastructure
>
TIC 2019-08-20 Handout Distributed at Meeting - 1989-2019 Allentown / Duwamish / Foster Point Projects and Expenditures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:21 PM
Creation date
8/28/2019 8:49:51 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/20/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ryan Hill Projects and Expenditures 1989 - 2019 <br />1989 Annexed into the City, took over SPU Water in 1996 <br />1990 1990 Annual Overlay- 109th, 111th <br />1993 1993 Annual Overlay- 47th Ave S from Ryan way to NCL. <br />1996 Ryan Hill Waterline Improvements, drainage and overlay <br />2001 2001 Small Drainage Projects - S 114th Street <br />2001 2001 Small Drainage Projects - S 107th Street <br />2002 2002 Small Drainage Projects - Ryan Way S <br />2004 2004 Annual Overlay- Ryan Way S <br />2012 2012 Small Drainage Program - 47th Ave S <br />2012 2012 Small Drainage Program - S 107th St <br />2012 2012 Small Drainage Program - 49th Ave S <br />2012 2012 Small Drainage Program - S 114th St <br />2014 2014 Annual Overlay- Beacon Ave S, 49th Ave, S 107th, S 114th <br />2015-2019 Beacon Ave S Bridge (new deck and seismic retrofit) <br />Future <br />Martin Luther King Jr Wy S Water Main <br />Expenditures <br />$ 85,000.00 <br />180,000 <br />513,000 <br />105,000 <br />60,000 <br />75,000 <br />300,000 <br />106,869 <br />146,119 <br />51,100 <br />38,473 <br />520,000 <br />1,186,928 <br />Total $3,367,489.24 <br />$ 545,000.00 <br />Roads <br />Roads <br />Water <br />SWM <br />SWM <br />SWM <br />Roads <br />SWM <br />SWM <br />SWM <br />SWM <br />Roads <br />Bridges <br />94-WTO3 <br />W:\Shared Copy Only \Gail\Neighborhood Projects 1989-201991030619.,1s, <br />
The URL can be used to link to this page
Your browser does not support the video tag.