City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-08-20 Handout Distributed at Meeting - 1989-2019 Allentown / Duwamish / Foster Point Projects and Expenditures
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-08-20 Transportation and Infrastructure
>
TIC 2019-08-20 Handout Distributed at Meeting - 1989-2019 Allentown / Duwamish / Foster Point Projects and Expenditures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:21 PM
Creation date
8/28/2019 8:49:51 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/20/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
McMicken Projects and Expenditures 1989 - 2019 <br />Expenditures Project No. <br />1989 51st Ave S (S 160th St to S 166th St) $ 560,000 8610301 <br />1993 South 160th Street (42nd Ave S to 51st Ave S) 1,100,000 <br />1994 South 160th Street (51st Ave S to 53rd Ave S) 500,000 <br />1994 Slade Way Overlay and Pedestrian Path 25,000 <br />199X 53rd Ave S (Klickitat to Slade Way) 450,000 <br />199X 42nd Ave S Pedestrian Path (S 154th St to S 160th St) 85,000 <br />199X 51st Ave S & S 158th St c/g/sw/ug 325,000 <br />1994 Crystal Springs Park 567,000 <br />199X Crestview Park 90,000 <br />199X Klickitat Drive LTL and raised Pedestrian Path 525,000 <br />2000 2000 Small Drainage Program - Loop Drainage - Site 1 (Outfall) 104,067 <br />2000 2000 Small Drainage Program - Loop Drainage - Site 2 (47th Ave S/ S 156th St) 142,500 <br />2001 2001 Small Drainage Program - 54th Ave S 168,572 <br />2003 2003 Small Drainage Program - Loop Drainage Phase 2 190,029 <br />2004 2004 Small Drainage Program - Loop Drainage Phase 3 136,930 <br />2007 2007 Small Drainage Program - S 162nd St 51,114 <br />2014 I-5/Klickitat Dr - Unstable Slope/Elevated Walkway (Grant funded) 286,001 91410406 <br />2016 Crystal Springs Emergency Surface Water Repair 475,924 <br />2016 S 160th St Speed Cushion Pilot Project 47,237 91610410 <br />2017 2017 Small Drainage Project - 48th Ave S 338,646 <br />2019 42nd Avenue S Phase III/Gilliam Creek Culvert Replacement Project 10,537,780 99410303 <br />Majority of 42nd Ave S Phase 1I1 (from SR-518 to 5160th St), no Gilliam Creek <br />Total $ 16,705,800 <br />W:\Shared Copy Only\Gail \Neighborhood Protects 1989-2019 g1030619.xisx <br />
The URL can be used to link to this page
Your browser does not support the video tag.