Laserfiche WebLink
Thorndyke Projects and Expenditures 1989 - 2019 <br />1989 51st Ave S Bridge <br />51st Ave S Pedestrian Path and Drainage <br />S 150th St Pedestrian Path (42-48) <br />N Gilliam Creek <br />Gilliam Creek <br />46th Ave S Pedestrian Path (S 148th St - S 150th St) <br />S 148th St Pedestrian Path (TIB - 42nd Ave S) <br />S 150th St Pedestrian Path (TIB - 42nd Ave S) <br />S 152nd St Pedestrian Path (TIB - 42nd Ave S) <br />42nd Ave S Pedestrian Path (S 144th St - S 154th St) <br />1997 42nd Ave S Phase II (S 144th St to SC Blvd) <br />1999-2006 Tukwila International Blvd Phase I <br />Macadam Pedestrian Path & Drainage <br />2001 2001 Small Drainage Program - Site 5 - S 150th St <br />2002 S 150th St (42nd Ave S to 46th Ave S) with new traffic signal at 42nd Ave S <br />2002 2002 Small Drainage Program - Site 2 - 37th Place S Alley <br />2002 2002 Small Drainage Program - Site 3 - S 154th St <br />2003 2003 Small Drainage Program - Site 1- 40th Ave S <br />2003 2003 Small Drainage Program - Site 5 - S 154th St <br />2003 2003 Small Drainage Program - Site 6 - S 146th St <br />2005 2005 Small Drainage Program - Site 3 - 42nd Ave S <br />2007 2007 Small Drainage Program - Site 8 - S 146th St at 42nd Ave S <br />2009 2009 Small Drainage Program - Site 1 - S 146th St Drainage Improvements <br />2011 2011 Small Drainage Program - Gilliam Creeek Control Structure Access <br />2012 Thorndyke Safe Routes to School (S 150th St) <br />2012 2012 Small Drainage Program - Gilliam Creeek Inlet <br />2015 2015 Small Drainage Program - 51st Ave S - Roadway Culvert Replacements <br />2016 2016 Small Drainage Program - Gilliam Creek Control Structure Access Improvements <br />2017 2017 Small Drainage Program - S 150th St Creek Outfall <br />2017 Part of 42nd Ave S (from SC Blvd to SR-518) & Gilliam Creek Culvert <br />2018 South 144th St Phase II <br />2018 TIB Channelization Study <br />Expenditures <br />$ 1,791,000.00 <br />50,000.00 <br />30,000.00 <br />50,000.00 <br />55,000.00 <br />59,000.00 <br />82,000.00 <br />69,000.00 <br />39,000.00 <br />80,000.00 <br />2,100,000.00 <br />11,075,000.00 <br />35,000.00 <br />82,507.00 <br />1,121,835.28 <br />65,574.00 <br />22,757.00 <br />40,280.00 <br />49,445.00 <br />55,770.00 <br />21,600.00 <br />46,998.00 <br />150,000.00 <br />68,500.00 <br />1,472,076.62 <br />135,432.00 <br />76,968.00 <br />86,340.00 <br />69,630.00 <br />4,000,000.00 <br />2,871,560.86 <br />42,002.22 <br />Total $25,994,275.98 <br />Project No. <br />99110403 <br />00DR01 <br />99910301 <br />01DRO3 <br />01DRO3 <br />03DRO1 <br />03DRO1 <br />03DRO1 <br />05DRO1 <br />07DRO1 <br />09DRO1 <br />91041201 <br />91210302 <br />91241201 <br />91541201 <br />91641201 <br />91741201 <br />99410303 <br />99510402 <br />81710404 <br />W:\Shared Copy Only \Gail \Neighborhood Projects 1989-2019 gl 030619.x1sx <br />