Laserfiche WebLink
TO: <br />FROM: <br />BY: <br />CC: <br />DATE: <br />SUBJECT: <br />EUor'ks hepart!n rtt Henry Hash, <br />INFORMATIONAL MEMORANDUM <br />Transportation and Infrastructure Committee <br />Henry Hash Public Works Director <br />Hari Ponnekanti, Deputy PW Director <br />Mayor Ekberg <br />October 18, 2019 <br />Public Safety Plan — Public Works Shops <br />Project No. 91630601, Contract No. 18-197 <br />Amendment No. 2 with SHKS for Phase 1 Design of Heiser Building <br />Allan Ekberg, Mayor. <br />ISSUE <br />Approve Amendment No. 2 to Contract No. 18-197 with SHKS Architects to design the Heiser Building <br />tenant improvements as part of the Public Works Shops Phase 1 <br />BACKGROUND <br />The City purchased the Heiser property at 11210 and 11234 Tukwila International Blvd in 2018 and <br />took possession in July 2019 for the new Public Works Shops. City Council approved a Master <br />Planning and Programming contract with SHKS Architects for $299,997 in September 2018. <br />Amendment No. 1 to this contract was for $16,500 to complete demolition specifications. <br />ANALYSIS <br />SHKS has completed the Master Planning effort and Phase 1 includes relocating the George Long <br />and Longacres operations to the Heiser Building. Divisions being relocated include facilities and fleet <br />operations, the Police vehicle impound yard, and the Longacres spoils site. Amendment No. 2 with <br />SHKS Architects will design the necessary improvements to the Heiser Building to include seismic <br />retrofit, interior and exterior improvements, upgrades to the HVAC, mechanical, electrical, and storm <br />drainage systems. <br />FINANCIAL IMPACT <br />Land Purchases <br />SOJ Contract <br />SHKS Contract 18-197 <br />SHKS Amendment No. 2 <br />SHKS 10% Contingency <br />Misc. Charges Survey, Attorney <br />Bond Debt Service Charges <br />Lydig Demolition <br />Total $ 26.068.073.97 <br />Total Expenditures <br />Expenditures Balance Owin 2019 Budget <br />$ 25,334,123„00 <br />166,757.52 <br />267,226.09 <br />128,826.35 <br />171,141.01 <br />$ 49,270.91 <br />414,900.00 <br />41,490.00 <br />73,707.00 <br />_55 W 79367.91 <br />26 647.441.88 <br />$ 30,000,000.00 <br />$ 30,000,000.00 <br />RECOMMENDATION <br />Council is being asked to approve Amendment No„ 2 to Contract No. 18-197 with SHKS Architects for <br />$414,900.00 with $41,490.00 in contingency for a total of $456,390.00 for design services for the Public <br />Works Shops Phase 1 and to consider this item at the October 28, 2019 Committee of the Whole and <br />subsequent November 4, 2019 Regular Council meeting. <br />Attachments: SHKS Contract Amendment No.2 <br />W:IPW EngIPROJECTSW- BG Projects101 Public Safety PIanIPW Shops First Phase (91630601)1Info Memo SHKS Am 2101819.docx <br />25 <br />