Laserfiche WebLink
Tukwila PW <br />SIIIIIKSARCH ITECTS <br />10/15/2019 <br />Estimated MACC $3,500,000 <br />Per A/E Fee Schedule C 10.74% <br />Fee $375,900 <br />Team Composition <br />SHKS <br />PIC <br />JH <br />PM <br />AH <br />PA <br />PW <br />Staff <br />MF <br />Staff <br />TBD <br />Rate <br />$175 $135 $105 $90 $65 <br />Basic Services Estimator <br />Discipline <br />Consultant <br />Pre -Design <br />Schematic Design <br />Design Development <br />Construction <br />Documents <br />Bidding Phase <br />Construction <br />Administration <br />Close Out <br />Total <br />18% <br />20% <br />31% <br />2% <br />27% <br />2% <br />$67,662 <br />$75,180 <br />$116,529 <br />$7,518 <br />$101,493 <br />$7,518 <br />$375,900 <br />Target % of fee <br />Architectural <br />56% <br />$37,891 <br />$42,101 <br />$65,256 <br />$4,210 <br />$56,836 <br />$4,210 <br />$210,504 <br />Subconsultant M <br />10% <br />Structural <br />14% <br />$8,612 <br />$9,568 <br />$14,831 <br />$957 <br />$12,917 <br />$957 <br />$47,842 <br />Mechanical <br />15% <br />$9,227 <br />$10,252 <br />$15,890 <br />$1,025 <br />$13,840 <br />$1,025 <br />$51,259 <br />Electrical <br />10% <br />$6,151 <br />$6,835 <br />$10,594 <br />$683 <br />$9,227 <br />$683 <br />$34,173 <br />Cost <br />5% <br />$3,076 <br />$3,417 <br />$5,297 <br />$342 <br />$4,613 <br />$342 <br />$17,086 <br />100% <br />Additional Service <br />Value Engineering <br />$7,500 <br />Maintenance Facility Design <br />$10,000 <br />Existing Building Survey <br />$9,000 <br />AS -Built Documentation <br />$5,000 <br />Envelope Consulting <br />$7,500 <br />Subtotal <br />$414,900 <br />12% <br />Design Services Contingency <br />Total <br />10% $41,490 <br />$456,390 <br />26 <br />