Laserfiche WebLink
State Six Year Transportation Improvement Program <br />From 2021 to 2026 <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC Y Inside N Outside <br />m <br />3 <br />'< <br />m <br />A. PIN/Project No. B. STIP ID <br />D <br />o <br />D <br />o <br />Er <br />z <br />C. Project Title <br />= <br />D <br />3 <br />3 <br />2 <br />Er <br />D. Road Name or Number <br />CL o <br />a <br />0 <br />n <br />m o <br />3 <br />E. Begin & End Termini <br />-. <br />0 <br />3 <br />m <br />Z <br />�c <br />o <br />a <br />' <br />N 'm_ <br />F. Project Description G. Structure ID <br />to <br />a <br />.:_ �. <br />P <br />a <br />m <br />fD <br />m <br />`T <br />m <br />a <br />00 <br />WA-11115 <br />06/22/20 <br />28 <br />0.140 <br />DCE <br />No <br />Green River Trail <br />Green River Trail <br />Christensen Road to Green River <br />Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved <br />trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and <br />pedestrian plaza. <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />ALL <br />2022 <br />0 <br />Ped/Bike Program <br />1,146,000 <br />128,000 <br />1,274,000 <br />Totals <br />tI <br />1,146,000 <br />128,000 <br />1,274,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd . <br />4th <br />5th & 6th <br />ALL <br />74,000 <br />1,200,000 <br />0 <br />0 <br />0 <br />Totals <br />74,000 <br />1,200,000 <br />0 <br />0 <br />0 <br />Report Date: May 19, 2020 Page 8 46 <br />