City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2020-06-01 Item 2E - Resolution - 2021-2026 Transportation Improvement Program
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2020 Transportation and Infrastructure Packets
>
2020-06-01 Transportation and Infrastructure
>
TIC 2020-06-01 Item 2E - Resolution - 2021-2026 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:31 PM
Creation date
5/28/2020 2:00:41 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/01/20
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State Six Year Transportation Improvement Program <br />From 2021 to 2026 <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC Y Inside N Outside <br />m <br />3 <br />'< <br />m <br />A. PIN/Project No. B. STIP ID <br />D <br />o <br />D <br />o <br />Er <br />z <br />C. Project Title <br />= <br />D <br />3 <br />3 <br />2 <br />Er <br />D. Road Name or Number <br />CL o <br />a <br />0 <br />n <br />m o <br />3 <br />E. Begin & End Termini <br />-. <br />0 <br />3 <br />m <br />Z <br />�c <br />o <br />a <br />' <br />N 'm_ <br />F. Project Description G. Structure ID <br />to <br />a <br />.:_ �. <br />P <br />a <br />m <br />fD <br />m <br />`T <br />m <br />a <br />17 <br />WA-11110 <br />06/22/20 <br />04 <br />0.350 <br />DCE <br />No <br />Macadam Rd S Complete Streets Project <br />Macadam Road <br />S 150th Street to S 144th Street <br />Design and construction of a complete street on Macadam Road. Road widening <br />and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of <br />the roadway. Includes illumination, curb, and storm drainage. <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2022 <br />0 <br />Ped/Bike Program <br />360,000 <br />40,000 <br />400,000 <br />P <br />RW <br />2022 <br />0 <br />Ped/Bike Program <br />90,000 <br />10,000 <br />100,000 <br />P <br />CN <br />2023 <br />0 <br />Ped/Bike Program <br />2,800,000 <br />300,000 <br />3,100,000 <br />Totals <br />0 <br />3,250,000 <br />350,000 <br />3,600,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd.- <br />4th <br />5th & 6th <br />PE <br />0 <br />0 <br />400,000 <br />0 <br />0 <br />RW <br />0 <br />0 <br />100,000 <br />0 <br />0 <br />CN <br />0 <br />0 <br />0 <br />3,100,000 <br />0 <br />Totals <br />0 <br />0 <br />500,000 <br />3,100,000 <br />0 <br />Report Date: May 19, 2020 Page 9 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.