City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2020-09-21 Agenda Front Sheet
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2020-09-21 Transportation and Infrastructure
>
TIC 2020-09-21 Agenda Front Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:35 PM
Creation date
9/17/2020 1:05:58 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
9/21/2020
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ftaa Ekberg i <br />�b�'d Y a ak. tea ?pew trr erat . Ho a Pa nekanti, to ter o £»rector <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Had Ponnekanti, Interim Public Works Director <br />BY: Adib Altallal, Project Manager <br />CC: Mayor Ekberg <br />DATE: September 18, 2020 <br />SUBJECT: CBD Sanitary Sewer Rehabilitation - 2020 <br />Project No. 91140203 <br />Bid Award <br />ISSUE <br />Award the contract to Michels Corporation for the 2020 Central Business District (CBD) Sanitary Sewer Rehabilitation Project. <br />BACKGROUND <br />The 2020 CBD Sanitary Sewer Rehabilitation Project will address deterioration of the approximately 50-year old sanitary <br />sewer pipes by relining the pipes with little impact to roadways and no excavation. <br />DISCUSSION <br />Three bids were received on August 27, 2020 for the 2020 Sanitary Sewer Rehabilitation Project. The bids were reviewed and <br />tabulated (see attached sheet) and no errors were found. Michels Corporation submitted the apparent low bid of $709,907.00 <br />and the Engineer's estimate was $848,177.00. Michels Corporation has previously performed work for the City and completed <br />that work satisfactory. <br />BUDGET AND BID SUMMARY <br />Engineers Bid Amount Budget <br />Estimate <br />Michels Corporation $848,177.00 $ 709,907.00 $ 1,100,000.00 <br />Contingency 20% 141,981.40 <br />$ 851,888.40 $1,100,000.00 <br />With the awarding contract to the Michels Corporation with a of the bid of $709,907.00, we also have a 20% contingency on <br />the project. The contingency amount of $141,981.40 is the allowable expense that the Mayor will be able to approve for any <br />change orders to the construction contracts. If at any time the project overruns the contingency amount, staff will return to <br />Committee and Council for approval. <br />RECOMMENDATION <br />Council is being asked to award the construction of the 2020 CBD Sanitary Sewer Rehabilitation Project to Michels <br />Corporation in the amount of $709,907.00 and is being asked to consider this item on the Consent Agenda at the October 5, <br />2020 Regular Meeting. <br />Attachments: Page 77, 2019 CIP <br />Map <br />Bid Tabulation <br />https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2020 Agenda Items/TIC 09-21-2020/02. CBD Sewer Bid Award/Info memo award to Michels <br />09182020.docx 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.