City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2020-09-21 Agenda Front Sheet
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2020 Transportation and Infrastructure Packets
>
2020-09-21 Transportation and Infrastructure
>
TIC 2020-09-21 Agenda Front Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:35 PM
Creation date
9/17/2020 1:05:58 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/21/20
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2019 to 2024 <br />PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />MAINT. IMPACT: <br />COMMENT: <br />The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and <br />becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. <br />If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the <br />last five years we have had four major pipe failures on Andover Park West and Andover Park East. <br />In 2014 and 2015, over 10,500 feet of asbestos sanitary sewer pipe were relined. In 2016 through 2018, <br />20,000 feet of asbestos sewer is scheduled to be relined. <br />Reduced maintenance and repair costs. <br />A Public Works Trust Fund loan was successfully obtained in 2012 for $750k. <br />FINANCIAL Through Estimated <br />(in $000's) <br />2017 2018 2019 <br />2020 <br />2021 <br />2022 <br />2023 <br />2024 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />394 <br />50 <br />45 <br />45 <br />40 <br />574 <br />Land(R/W) <br />1 <br />1 <br />Const. Mgmt. <br />310 <br />85 <br />120 <br />120 <br />75 <br />710 <br />Construction <br />1,983 <br />539 <br />1,100 <br />1,100 <br />550 <br />5,272 <br />TOTAL EXPENSES <br />2,688 <br />674 <br />1,265 <br />1,265 <br />665 <br />0 <br />0 <br />0 <br />0 <br />6,557 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />PW Trust Fund <br />750 <br />750 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />1,938 <br />674 <br />1,265 <br />1,265 <br />665 <br />0 <br />0 <br />0 <br />0 <br />5,807 <br />TOTAL SOURCES <br />2,688 <br />674 <br />1,265 <br />1,265 <br />665 <br />0 <br />0 <br />0 <br />0 <br />6,557 <br />1 <br />2019 - 2024 Capital Improvement Program <br />77 <br />6 <br />