City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
COT-City
>
City Clerk
>
Council Committees
>
Community Services and Safety (2020-Present)
>
Community Services and Safety Agenda Packets (2020-Present)
>
2020-09-28 Community Services and Safety
>
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 10:27:28 AM
Creation date
9/24/2020 11:36:19 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/28/20
Committee Name
Community Services and Safety 2020-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. List of potential program and activity elements <br />5. Prepare and participate in design charette <br />6. One-page tech memo summarizing programming <br />Task D - Alternative Development <br />Develop up to 2 alternatives for review by decision -makers. The alternatives will be <br />diagrammatic to keep the discussion focused on the big picture. One of the alternatives will <br />explore property acquisition adjacent to the site. <br />Water quality improvement concepts will be assessed for each option. <br />Design Team support for Task D will include: <br />BHC will provide alternative design input on the water quality improvement concepts <br />Task D Deliverables: <br />1. Up to 2 -page tech memo including design character definition <br />2. Two diagrammatic alternative concept plans <br />3. Up to 2 sections <br />4. Brief bulleted summary memo (2 pages) outlining alternative concepts <br />Task E — Draft Master Plan Design <br />The draft concept plan will be based on the preferred alternative selected during the Alternative <br />Development process, project objectives, assumptions and expectations as determined through <br />discussion with the City, stake holders and public input. A preliminary square -footage level cost <br />estimate will be provided for the draft and final master plan. <br />The draft master plan will be primarily AutoCAD -drafted (base); although some information <br />may be hand -drawn. The concept plan will be drawn at 1" =60' scale. Illustrative drawings will <br />be completed to convey design feasibility and finished project character. <br />Site Sections (JA13) <br />Draft Master plan graphics will include the development of up to 4 draft sections to illustrate the <br />design intent and character. <br />Perspective Sketch (JAB) <br />Development of a draft perspective sketch will be developed to illustrate the design intent and <br />character. Perspective will be limited to one. The view location for the perspective sketch will <br />be agreed upon with Parks prior to starting the draft perspective. <br />J.A. Brennan Associates, PLLC Tukwila Pond Master Plan 6 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.