Laserfiche WebLink
Design Tearer support for Task E include: <br />Prepare Draft wayfinding concepts. (John Mason) <br />1. Develop a wayfinding diagram, using signage and elements that allow visitors to <br />navigate the park and the site intuitively. Special needs visitors should find <br />something here that includes and celebrates them. <br />2. Create sketches that illustrate form, function, materiality and placement of key <br />wayfinding and brand identity features highlighted for initial master planning <br />purposes. These sketches are suitable for presentation to The City and the <br />community. <br />Prepare Draft Architectural Concepts — for park structures. (Schemata Workshop) <br />Schemata will prepare Draft Conceptual Floor Plans and Elevations for various <br />architectural park elements. These may include: Picnic shelter, restroom, boat rental <br />building, kiosk, event stage. <br />Prepare Draft Water quality recommendations (BHC Lead) <br />Recommendations may include surveying, condition inspection, sampling, and modeling <br />to better characterize the existing system and condition of Tukwila Pond. Identify the <br />locations where water quality improvements could be most impactful. Water quality <br />improvements may include stand-alone units like Filterra, cartridge -type filters, more <br />traditional water quality vaults, or an emerging technology from the Ecology TAPE <br />program. There may also be an opportunity to reclaim clean roof runoff from <br />surrounding buildings, and direct it to Tukwila Pond. <br />Identify opportunities for easements (BHC lead) <br />BHC will identify opportunities for improved connectivity to the park site and <br />surrounding context. These will be based on the vision casting discussions, stakeholder <br />discussions with the adjacent property owners, and the selected alternative. This can <br />include a discussion and potentially a map of which landowners might feel favorable <br />towards easements as well as which land might be appropriate for the City to target for <br />acquisition. Any stakeholder or City -derived data on preferred incentives can also be <br />included in this discussion. These deliverables can be derived from a virtual meeting with <br />the client in addition to one or two internal design team meetings (particularly <br />coordination between BHC and John Mason and Sieger Consulting) <br />Task E Deliverables: <br />1. Draft concept plans two sheets l = 60' <br />2. 2 Draft detail area plans <br />3. Revised context map with linkage and known development projects <br />4. Up to 4 draft sections <br />J.A. Brennan Associates, PLLC Tukwila Pond Master Plan <br />15 <br />