Laserfiche WebLink
transportation system for up to three proposed scenarios as developed by the design team. <br />02- Optional Task 2 Master Plan Report Documentation <br />Prepare and package report documentation. Create a final report that includes all of the <br />deliverables presented in the base scope as a legible, clear summary document. This task <br />deliverable includes compiling a final report document, with 1 revision. <br />03 Optional Task 3 — 30% Design of Phase 1 <br />The design development submittal will apply technical expertise to create design solutions to <br />schematic design problems. JAB will create a design development submittal that will be <br />primarily AutoCAD -drafted, although some information may be hand -drawn. Illustrative <br />drawings will be completed as a method to convey design feasibility and finished project <br />character. A preliminary square -footage level cost estimate will be provided for the design <br />development plan. Fees for 30% design may need to be adjusted depending on the complexity of <br />the work. <br />The final deliverables for this optional task include: <br />1. Design Development 30% design package <br />2. Cost Estimate <br />3. Updated illustrative plan and sections <br />4. Product memo <br />04 - Optional Task 4 Update 2018 Park I pact Fees to include <br />Southcenter Subarea Zone <br />Sieger Consulting <br />If desired, work with the City to revise the 2018 Park Impact Fee ordinance and rate schedule to <br />include a zone and rates for the Southcenter Subarea. <br />J.A. Brennan Associates, PLLC Tukwila Pond Master Plan 16 <br />24 <br />