City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
COT-City
>
City Clerk
>
Council Committees
>
Community Services and Safety (2020-Present)
>
Community Services and Safety Agenda Packets (2020-Present)
>
2020-09-28 Community Services and Safety
>
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 10:27:28 AM
Creation date
9/24/2020 11:36:19 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/28/20
Committee Name
Community Services and Safety 2020-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12. Cost estimate will be limited to the hours specified. Parks will review cost estimate <br />assumptions. Phasing is limited to hours on the fee spreadsheet and scope of work <br />13. Specifications will not be provided. <br />14. No DNR coordination or permitting is anticipated. <br />15. Limited tribal coordination is anticipated through regulator meeting process. <br />16. Drainage design is not included, conceptual design to stormwater requirements will be <br />considered as part of the master plan design. <br />17. Electrical design is not included, conceptual design to lighting will be considered as part <br />of the master plan design. <br />18. JAB will develop appropriate title block for printed master plan design boards, size: 30" <br />x 40". <br />19. Grant support will be limited to hours in Task J as part of this scope of work. <br />20. J.A. Brennan Associates will not be responsible for working with adjacent landowners <br />except through a specified meeting process. <br />21. The City will provide public meeting notices, and meeting organization. <br />22. The master plan will be complete by July 31, 2021. <br />23. City will be responsible for distribution (digtal or physical) and printing of all documents. <br />24. Public meeting presentation materials are anticipated to be plans mounted on boards <br />combined with a PowerPoint presentation. <br />25. Until guidance regarding COVID 19 response is provided from the State of Washington, <br />it is anticipated that initially over the first six months, public and stakeholder meetings <br />will be facilitated virtually online. Small group meetings may be hosted in a limited <br />fashion with a limited number of people based on State guidance for the number of <br />people allowed to gather. Parks and the City will lead the meeting facilitation and <br />organization. <br />26. The Watershed Company's role with respect to water quality will be limited to measuring <br />select water quality parameters only if the optional task is authorized. <br />27. No additional documentation will be required as the basis for the City's code <br />interpretation, anticipated under Task B. <br />28. Design work beyond Master Plan Design will require additional fee <br />Optional Tasks: Not Included in Base Scope <br />Additional services will be required to perform this work. <br />01 — Optional Task 1 Traffic Analysis <br />Heath Engineering <br />1. Review of current site plan data and road network serving the site. Meet with the team to <br />walk the site. <br />2. Review proposed accesses and research traffic volume information. <br />3. Review requirements from the city of Tukwila Public Works. <br />4. Ascertain trip generation volumes and distribution of the project volumes to the city <br />J.A.Brennan Associates, PLLC Tukwila Pond Master Plan 15 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.