City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
COT-City
>
City Clerk
>
Council Committees
>
Community Services and Safety (2020-Present)
>
Community Services and Safety Agenda Packets (2020-Present)
>
2020-09-28 Community Services and Safety
>
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 10:27:28 AM
Creation date
9/24/2020 11:36:19 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/28/20
Committee Name
Community Services and Safety 2020-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task J Deliverables <br />1. Summary memo of potential grants and funding sources <br />Task K — Permit Support <br />This task includes providing limited review and coordination with the City Community <br />Development Department as well as local and federal environmental agencies to define permit <br />requirements the park improvements will require. A brief memo will summarize permit <br />requirements and guide development implementation strategy. <br />A site visit with permit agencies, anticipated during the draft Master Plan design process, will be <br />included to better inform the permit review agencies with the project site and to receive input to <br />refine design strategies. <br />Task K Deliverables <br />1. An environmental permit memo which will include a summary of the code interpretation <br />review and information gathered during the agency site walk through. <br />Assumptions: <br />1. Wetland/OHWM delineation is not required. <br />2. J.A. Brennan does not provide contaminated soils remediation services. No contaminated <br />soils are anticipated on site. <br />3 Architectural services are limited to conceptual floor plans and limited conceptual <br />renderings. <br />4, The Client will provide coordinated, consolidated review comments at each submittal. <br />Client review period will take no longer than three weeks. <br />5. We will use J.A. Brennan CAD standards. <br />6. Client will provide base mapping for project area including topography, high quality air <br />photo. any available wetland mapping, important water elevations, parcel boundaries, <br />pavement edges, roads, utilities, and vegetation and other information needed for design. <br />7. The Client will lead the correspondence and outreach with Stakeholders, adjacent property <br />owners, community members and the general public. JAB will support outreach to the <br />extent described in Task F. <br />8. JA Brennan team can use the existing population and density forecast that was developed <br />for the vision for the Southcenter area. This will be provided by the Client. <br />9. Client will provide data and feedback collected during recent community engagement <br />efforts in order to assist with preparation of the visioning exercises. <br />10. Survey of the site is not included. JA Brennan anticipates up to 12 hours to develop an <br />existing conditions base map using GIS and or CAD data provided by Parks and some <br />field measurements work. <br />11. Graphics may be hand drawn during Concept design. <br />J.A. Brennan Associates, PLLC Tukwila Pond Master Plan 14 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.