Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2022 to 2027 <br />Y Inside N Outside <br />Funding <br />Status <br />Phase <br />m <br />Federal Fund Code <br />Fede unds St Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />PE <br />2022 <br />a <br />O <br />5 <br />0 <br />R' <br />0 <br />1,500,000 <br />m <br />CN <br />A. PIN/Project No. B. STIP ID <br />STP(BR) <br />01000 TIB <br />3,000,000 <br />o <br />15,000,000 <br />P <br />0 <br />m <br />� <br />2,63 FMSIB <br />w <br />z <br />C. Project Title <br />5,529,000 <br />m <br />m <br />500460 <br />m <br />3,029,000 <br />22,029,000 <br />c <br />D. Road Name or Number <br />m <br />o Q� <br />c <br />o <br />n <br />m <br />m <br />n <br />m 0 <br />a <br />E. Begin & End Termini <br />�. <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m0. <br />05 <br />TUK-62 <br />06/14/21 <br />1/ <br />11 <br />0.100 <br />DCE <br />Yes <br />42nd Ave S Bridge Replacement <br />42nd Ave S over the Duwamish River <br />Interurban Ave S to Northern end of bridge <br />VIII\\ <br />Replace the existing 42nd Ave S steel truss bridge. The replacement will require <br />IIIIII <br />preliminary engineer design, right-of-way, and construction phases. The new <br />I <br />structure will meet current road and bridge design standards. The replacement <br />structure configuration will be two through -lanes, possibly a turn pocket, and include <br />sidewalks. <br />p� <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Fede unds St Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />PE <br />2022 <br />STP <br />5 <br />0 <br />0 <br />1,500,000 <br />P <br />CN <br />2024 <br />STP(BR) <br />01000 TIB <br />3,000,000 <br />0 <br />15,000,000 <br />P <br />CN <br />2024 <br />STP <br />2,63 FMSIB <br />w <br />500,000 <br />3,029,000 <br />5,529,000 <br />Tot <br />500460 <br />3,500,000 <br />3,029,000 <br />22,029,000 <br />Expenditure Schedule <br />Phase 1st 2nd 4th 5th & 6th <br />PE 750,000 1,250,000 0 0 0 <br />CN 0 0 9,450, 000 9,450, 000 0 <br />Totals 750,000 1,250,000 9,450,000 9,450,000 0 <br />Report Date: May 19, 2021 Page 1 21 <br />