Washington stato
<br />Vo 0epaAment of Transportation
<br />Agency: Tukwila
<br />County: King
<br />MPO/RTPO: PSRC
<br />Six Year Transportation Improvement Program
<br />From 2022 to 2027
<br />Y Inside N Outside
<br />Funding
<br />Status
<br />Phase
<br />m
<br />Federal Fund Code
<br />Fede unds St Fund Code
<br />State Funds
<br />Local Funds
<br />Total Funds
<br />S
<br />PE
<br />2022
<br />a
<br />O
<br />5
<br />0
<br />R'
<br />0
<br />1,500,000
<br />m
<br />CN
<br />A. PIN/Project No. B. STIP ID
<br />STP(BR)
<br />01000 TIB
<br />3,000,000
<br />o
<br />15,000,000
<br />P
<br />0
<br />m
<br />�
<br />2,63 FMSIB
<br />w
<br />z
<br />C. Project Title
<br />5,529,000
<br />m
<br />m
<br />500460
<br />m
<br />3,029,000
<br />22,029,000
<br />c
<br />D. Road Name or Number
<br />m
<br />o Q�
<br />c
<br />o
<br />n
<br />m
<br />m
<br />n
<br />m 0
<br />a
<br />E. Begin & End Termini
<br />�.
<br />z
<br />I
<br />a.
<br />C.
<br />N m
<br />F. Project Description G. Structure ID
<br />o
<br />m
<br />N
<br />m0.
<br />05
<br />TUK-62
<br />06/14/21
<br />1/
<br />11
<br />0.100
<br />DCE
<br />Yes
<br />42nd Ave S Bridge Replacement
<br />42nd Ave S over the Duwamish River
<br />Interurban Ave S to Northern end of bridge
<br />VIII\\
<br />Replace the existing 42nd Ave S steel truss bridge. The replacement will require
<br />IIIIII
<br />preliminary engineer design, right-of-way, and construction phases. The new
<br />I
<br />structure will meet current road and bridge design standards. The replacement
<br />structure configuration will be two through -lanes, possibly a turn pocket, and include
<br />sidewalks.
<br />p�
<br />Funding
<br />Status
<br />Phase
<br />Phase Start Year (YYYY)
<br />Federal Fund Code
<br />Fede unds St Fund Code
<br />State Funds
<br />Local Funds
<br />Total Funds
<br />S
<br />PE
<br />2022
<br />STP
<br />5
<br />0
<br />0
<br />1,500,000
<br />P
<br />CN
<br />2024
<br />STP(BR)
<br />01000 TIB
<br />3,000,000
<br />0
<br />15,000,000
<br />P
<br />CN
<br />2024
<br />STP
<br />2,63 FMSIB
<br />w
<br />500,000
<br />3,029,000
<br />5,529,000
<br />Tot
<br />500460
<br />3,500,000
<br />3,029,000
<br />22,029,000
<br />Expenditure Schedule
<br />Phase 1st 2nd 4th 5th & 6th
<br />PE 750,000 1,250,000 0 0 0
<br />CN 0 0 9,450, 000 9,450, 000 0
<br />Totals 750,000 1,250,000 9,450,000 9,450,000 0
<br />Report Date: May 19, 2021 Page 1 21