Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2022 to 2027 <br />Y Inside N Outside <br />Im 1111" f6NNUMffpffvu"".,.wIIP'r <br />Funding <br />11h,` <br />Phase <br />1st <br />2nd <br />3rd 4th 5th & 6th <br />Status <br />Phase <br />m <br />0 0 0 <br />Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />P <br />P <br />PE <br />RW <br />CN <br />2022 <br />2023 <br />2024 <br />0 <br />SRTS <br />SRTS <br />SRTS <br />180,000 <br />230,000 <br />1,865,000 <br />85,000 <br />20,000 <br />200,000 <br />265,000 <br />250,000 <br />2,065,000 <br />Totals <br />0 <br />2,275,000 <br />305,000 <br />a <br />O <br />R' <br />0 <br />m <br />A. PIN/Project No. B. STIP ID <br />o <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />m <br />c <br />D. Road Name or Number <br />m <br />o Q� <br />c <br />o <br />n <br />m <br />m <br />n <br />m 0 <br />a <br />E. Begin & End Termini <br />�. <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m0. <br />19 <br />WA -11113 <br />06/14/21 <br />1/ <br />05 <br />0.370 <br />Yes <br />46th Avenue Safe Routes to School <br />46th Avenue S <br />S 150th Street to S 144th Street <br />VIII\\ <br />Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, <br />IIIIII <br />including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised <br />I <br />I <br />crosswalk across S 144th Street with RRFB. <br />�ff� <br />Im 1111" f6NNUMffpffvu"".,.wIIP'r <br />Funding <br />11h,` <br />Phase <br />1st <br />2nd <br />3rd 4th 5th & 6th <br />Status <br />Phase <br />Phase Start Year (YYYY) Federal Fund Code Federal F <br />0 0 0 <br />Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />P <br />P <br />PE <br />RW <br />CN <br />2022 <br />2023 <br />2024 <br />0 <br />SRTS <br />SRTS <br />SRTS <br />180,000 <br />230,000 <br />1,865,000 <br />85,000 <br />20,000 <br />200,000 <br />265,000 <br />250,000 <br />2,065,000 <br />Totals <br />0 <br />2,275,000 <br />305,000 <br />2,580,000 <br />A110" "miuUR wiui <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd 4th 5th & 6th <br />PE <br />265,000 <br />0 <br />0 0 0 <br />RW <br />0 <br />250,000 <br />0 0 0 <br />CN <br />0 <br />0 <br />2,065,000 0 0 <br />Totals <br />265,000 <br />250,000 <br />2,065,000 0 0 <br />Report Date: May 19, 2021 Page 2 22 <br />