City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
21-085 - City of SeaTac - Interlocal Agreement: 42nd Ave S / S 164th St ADA Ramps
COT-City
>
City Clerk
>
Interlocal Agreements
>
2016-2021 Interlocal Agreements
>
21-085 - City of SeaTac - Interlocal Agreement: 42nd Ave S / S 164th St ADA Ramps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:21:30 AM
Creation date
6/7/2021 10:20:59 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
21-085
Contractor (example *sabey*)
City of SeaTac
Description (example *tourism*)
Interlocal Agreement: 42nd Ave S / S 164th St ADA Ramps
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. PURPOSE <br />1.1. This Agreement defines the roles and responsibilities between the Parties for construction <br />of the PROJECT and specifies reimbursement to SEATAC by TUKWILA for the costs of <br />performing the WORK. <br />2. SEATAC RESPONSIBILITIES <br />2.1. SEATAC shall design and construct the PROJECT to be consistent with the "Proposed <br />Design" as specified in Exhibit A. <br />2.2. SEATAC shall design and construct the WORK as part of the PROJECT to be consistent <br />with the "Proposed Design" as specified in Exhibit A. A separate Bid Schedule shall be <br />included in the Bid Proposal and constitute full expenditures for this work. <br />2.3. SEATAC shall submit to TUKWILA, for TUKWILA review and written approval of all <br />PROJECT elements to be constructed within TUKWILA right of way, as shown in 100% <br />(Bid Ready) PROJECT design plans and specifications. <br />2.4. SEATAC shall construct the PROJECT in accordance with the approved plans and <br />specifications, as provided in the 100% (Bid Ready) PROJECT design plans and <br />specifications. Prior to constructing the WORK, SEATAC shall: <br />2.4.1. Give TUKWILA written notice fourteen (14) calendar days prior to the start of the <br />construction of the WORK; <br />2.4.2. Coordinate with TUKWILA on the correction of items identified during <br />construction as not conforming to the final approved PROJECT plans and <br />specifications. SEATAC shall make the final decision regarding such corrections; <br />2.4.3. SEATAC will notify TUKWILA of all change orders for WORK being constructed <br />within the TUKWILA ROW. TUKWILA may provide SEATAC with comments <br />related to such change orders, but SEATAC will proceed with such changes in its <br />sole discretion except as provided in 2.4.3.1 <br />2.4.3.1. Any change orders necessary for completions of the WORK shall be <br />approved by TUKWILA within five (5) business days, prior to SEATAC's <br />approval. <br />2.5. Bid Process — SEATAC shall provide the bid tabulation to TUKWILA for review prior to <br />contract award. Within five (5) business days of receiving the bid tabulation, TUKWILA <br />shall notify SEATAC in writing that TUKWILA either agrees to proceed with the WORK <br />as part of the PROJECT, or TUKWILA chooses not to proceed with the WORK. <br />{KZS2401020.DOCX;1/13175.000001/} <br />
The URL can be used to link to this page
Your browser does not support the video tag.