Laserfiche WebLink
1. PURPOSE <br />1.1. This Agreement defines the roles and responsibilities between the Parties for construction <br />of the PROJECT and specifies reimbursement to SEATAC by TUKWILA for the costs of <br />performing the WORK. <br />2. SEATAC RESPONSIBILITIES <br />2.1. SEATAC shall design and construct the PROJECT to be consistent with the "Proposed <br />Design" as specified in Exhibit A. <br />2.2. SEATAC shall design and construct the WORK as part of the PROJECT to be consistent <br />with the "Proposed Design" as specified in Exhibit A. A separate Bid Schedule shall be <br />included in the Bid Proposal and constitute full expenditures for this work. <br />2.3. SEATAC shall submit to TUKWILA, for TUKWILA review and written approval of all <br />PROJECT elements to be constructed within TUKWILA right of way, as shown in 100% <br />(Bid Ready) PROJECT design plans and specifications. <br />2.4. SEATAC shall construct the PROJECT in accordance with the approved plans and <br />specifications, as provided in the 100% (Bid Ready) PROJECT design plans and <br />specifications. Prior to constructing the WORK, SEATAC shall: <br />2.4.1. Give TUKWILA written notice fourteen (14) calendar days prior to the start of the <br />construction of the WORK; <br />2.4.2. Coordinate with TUKWILA on the correction of items identified during <br />construction as not conforming to the final approved PROJECT plans and <br />specifications. SEATAC shall make the final decision regarding such corrections; <br />2.4.3. SEATAC will notify TUKWILA of all change orders for WORK being constructed <br />within the TUKWILA ROW. TUKWILA may provide SEATAC with comments <br />related to such change orders, but SEATAC will proceed with such changes in its <br />sole discretion except as provided in 2.4.3.1 <br />2.4.3.1. Any change orders necessary for completions of the WORK shall be <br />approved by TUKWILA within five (5) business days, prior to SEATAC's <br />approval. <br />2.5. Bid Process — SEATAC shall provide the bid tabulation to TUKWILA for review prior to <br />contract award. Within five (5) business days of receiving the bid tabulation, TUKWILA <br />shall notify SEATAC in writing that TUKWILA either agrees to proceed with the WORK <br />as part of the PROJECT, or TUKWILA chooses not to proceed with the WORK. <br />{KZS2401020.DOCX;1/13175.000001/} <br />