City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
21-085 - City of SeaTac - Interlocal Agreement: 42nd Ave S / S 164th St ADA Ramps
COT-City
>
City Clerk
>
Interlocal Agreements
>
2016-2021 Interlocal Agreements
>
21-085 - City of SeaTac - Interlocal Agreement: 42nd Ave S / S 164th St ADA Ramps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:21:30 AM
Creation date
6/7/2021 10:20:59 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
21-085
Contractor (example *sabey*)
City of SeaTac
Description (example *tourism*)
Interlocal Agreement: 42nd Ave S / S 164th St ADA Ramps
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.5.1. The basis of contract award for the PROJECT will be the lowest, responsive, and <br />responsible bidder on the total base bid for all PROJECT work. Although the WORK <br />will be included in the total base bid, it will be listed on a separate schedule. <br />2.6. Within one hundred and eighty (180) calendar days following SEATAC's final acceptance <br />of the PROJECT, SEATAC shall submit to TUKWILA an electronic copy of record (as - <br />built) drawings signed and stamped by the engineer of record. <br />3. TUKWILA RESPONSIBILITIES <br />3.1. TUKWILA shall review and approve the 100% (Bid Ready) plans and specifications, <br />including the Bid Schedule associated with the WORK, and return written review <br />comments to SEATAC within five (5) business days of receipt. <br />3.2. TUKWILA, at its discretion and sole cost, may furnish an inspector during construction <br />of the WORK in the City of Tukwila. <br />3.2.1. TUKWILA's Designated Representative specified in Section 5 will provide <br />SEATAC with the contact information for its inspector. All contact between said <br />inspector and SEATAC's contractor shall be through SEATAC's Designated <br />Representative as specified in Section 5. <br />3.2.2. During construction of the PROJECT, TUKWILA shall have the right to inspect <br />the WORK and shall coordinate with SEATAC on the correction of items identified <br />during construction as not conforming to the final approved PROJECT plans and <br />specifications as provided in Section 2.4.2 above. <br />3.3. Subsequent final acceptance, after project completion, TUKWILA shall be responsible <br />for all operation, maintenance, repair, removal, and/or replacement of all PROJECT <br />elements within TUKWILA ROW. <br />4. FINAL INSPECTION AND ACCEPTANCE OF THE PROJECT <br />4.1. Final Inspection - SEATAC shall administer Final Inspection of the PROJECT. <br />TUKWILA shall be invited to participate in the Substantial Completion Inspection <br />activities, including any formal PROJECT tours and any formal meetings or discussions. <br />TUKWILA will submit to SEATAC a complete list of concerns or deficiencies within ten <br />(10) calendar days of the date of the Substantial Completion Inspection for inclusion in <br />the formal punch list. SEATAC shall provide notice of the time and date of the Final <br />Inspection to TUKWILA a minimum of fifteen (15) calendar days prior to the Final <br />Inspection. <br />4.2. TUKWILA Final Acceptance of WORK - After Final Inspection and TUKWILA's <br />determination of adequate completion of any and all punch list work, TUKWILA will <br />issue a letter of final acceptance to SEATAC for the WORK. If TUKWILA determines <br />{KZS2401020.DOCX;1/13175.000001/} <br />