City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2012-03-22- ITEM 4 - OSTERLY PARK TOWNHOMES - STAFF REPORT
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2012-03-22 Planning Commission - Osterly Park Townhomes
>
Planning 2012-03-22- ITEM 4 - OSTERLY PARK TOWNHOMES - STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:05:55 PM
Creation date
3/16/2012 1:23:51 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
03/22/12
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION ONE DESIGN REVIEW MAJOR MODIFICATION <br />DECISION CRITERIA DESIGN REVIEW <br />The Osterly Park Townhomes project is subject to design review under 18.14.060 requiring all <br />multi- family strictures to receive design review approval. Per TMC 18.60.050 (C), townhouse <br />development is subject to the design criteria contained in the Townhouse Design Manual. The <br />project is proposed to be constricted as originally approved, with development broken up into two <br />separate phases. Phasing criteria of TMC 17.14.040 require that a project be reviewed to ensure <br />that each phase meets all pertinent development standards on its own in case subsequent phases <br />are not able to be constricted. <br />The following is a discussion of the changes to the design of the project proposed during Phase I, <br />in relation to applicable architectural review criteria. The applicable architectural review criteria <br />for townhouse development are contained in Tukwila's Townhouse Design Manual, available <br />online at htti):// www. tukwilawa /dcd /dcdi)lan.html. <br />L SITE PLANNING <br />C'ircukition (Petlestrian and Vehicular) <br />Both phases include a comprehensive system of sidewalks which link the recreation areas and the <br />entrances to all buildings within the project to the 5 -foot wide sidewalks on both sides of the <br />private access road. Sidewalks along the private access road connect to the 6 -foot wide sidewalks <br />along S 144 Street. A 5 -foot wide sidewalk segment has been added to the southern part of the <br />site for Phase I, to connect sidewalks on the east and west sides of the private access road to the <br />Phase I recreation space located at the southwestern corner of Phase L If Phase II does not occur, <br />10 feet of Type I rear yard perimeter landscaping is required along the south property line. Staff <br />recommends as a condition of approval of this application that plans be revised as part of the <br />Public Works permit to add rear yard landscaping on the south side of the new Phase I sidewalk <br />shown along the south property line per landscaping requirements in the HDR zoning district. <br />There are two access points to the site for vehicles for the completed project, one from S 144 <br />Street and another from 34 Ave S. These two driveways allow through- movement from 34 Ave <br />S to S 144 Street. If Phase 11 does not occur, the only vehicle access to the project site will be <br />from S. 144 Street. The shared garage access areas provide room for vehicle maneuvering into <br />and out of the private road. The resulting cul -de -sac, if Phase I were to stand on its own without <br />constriction of Phase II, would be low volume to allow multiple use for street oriented <br />social /recreation areas, consistent with circulation guidelines in the Townhouse Design Manual. <br />Parking <br />Tukwila parking requirements contained in TMC 18.56.065 require two off street parking spaces <br />for each dwelling unit which contains up to three bedrooms. Parking for residents of the Osterly <br />Park Townhomes project will be within the attached two -car garage for each unit. These garages <br />are accessed from shared garage access areas located off the private access road to minimize <br />conflicts between autos and pedestrians and to better screen garage areas from view. <br />JR Page 7 of IS 03 1x'2012 <br />H: Design Review Osterly Townhomes Major Modification_L12 -005 PL12 -1111 1_12 -005 LOS- 1179_PL12 -1111 Osterh- Major Modification SRdoc 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.