City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2012-03-22- ITEM 4 - OSTERLY PARK TOWNHOMES - STAFF REPORT
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2012-03-22 Planning Commission - Osterly Park Townhomes
>
Planning 2012-03-22- ITEM 4 - OSTERLY PARK TOWNHOMES - STAFF REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:05:55 PM
Creation date
3/16/2012 1:23:51 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
03/22/12
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The continuation of the private access drive as part of Phase II includes twelve on- street guest <br />parking spaces on the south side of the site. The design of Phase I does not currently include guest <br />parking. Shared garage access areas provide enough space for maneuvering into and out of the <br />garages for each townhome unit, but there is no additional space in these areas for guest parking <br />and the Codes, Covenants, and Restrictions for the development prohibit any parking in these <br />areas to maintain garage access for residents. The width of the private access drive for Phase I is <br />?0 feet, which is not wide enough to allow on- street parking while at the same time maintaining <br />enough width for emergency vehicle access. Additionally, on- street parking is not permitted on S. <br />144 Street in the vicinity of the Osterly Park Townhomes project. <br />Staff recommends a condition of approval be added to require the addition of a minimum of two <br />guest parking spaces, to be located at the south end of Phase 1. Staff recommends the design of <br />these spaces be reviewed as part of the Public Works constriction permit for Phase 1. These spaces <br />will then be removed and the private access drive extended to provide the guest parking spaces <br />originally designed for the project at such time as Phase 11 is constricted. <br />C'Ninte PNevention <br />The design of this project incorporates several elements to reduce opportunities for crime. If Phase <br />II were not to be constricted, the decorative fence along both S 144 Street would still be <br />constricted as originally proposed, located approximately 5 feet back from the public sidewalk <br />along S 144 Street. This fence provides both a symbolic and a physical barrier between the <br />project site and the public street from which access is provided to the development. The fence is <br />open, allowing surveillance of the street from street facing units. Additionally, a low wooden <br />fence will be used to separate the public realm from the private front yard areas of the units facing <br />S 144 St. A 6 -foot high perimeter wood fence is proposed along the side property lines of the <br />entire development. If Phase II is not constricted, staff recommends a condition of approval to <br />require a wood fence be constricted around the sides and rear perimeter of property included as <br />part of Phase I to separate the site from adjacent properties. Similar to a fence around the back <br />yard area of a single family home, this will help residents maintain surveillance of and limit access <br />to private common areas of the site, including the recreation space and guest parking area. <br />The recreation area proposed for Phase I is designed to be temporary until Phase II proceeds and <br />the recreation spaces originally approved can be constricted. However, there will be a need for <br />lighting for safety and surveillance of the recreation area, guest parking area, and mailbox cluster <br />of Phase I until such time as Phase 11 is constricted. Staff recommends a condition of approval to <br />require that lighting be added to the Phase I recreation space, guest parking area, and cluster <br />mailbox location to support enhanced safety and surveillance of these areas. Staff recommends <br />this change to the lighting design be made as part of the Public Works constriction permit for <br />Phase I, and reviewed administratively according to lighting level requirements contained in TMC <br />section 18.52.065, the Tukwila Infrastructure Design and Constriction Standards, and <br />recommendations from the Tukwila Police Department. <br />IL BUILDING DESIGN <br />There are no changes proposed to the building design. However, if Phase II does not occur, the <br />only building type included with this project will be building type B (see elevations in Attachment <br />JR Page 8 of 18 03 1x'21.112 <br />14 H: Design Review Osterh- Townhomes Major Modification_L12 -005 PL12 -00 1_12 -005 Lob- 1179_PL12 -1111 Osterh- Major Modification SRdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.