City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2022-05-16 Item 2C - Contract - Fire Station #53 Exterior Painting with Long Painting Company
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2022-05-16 Transportation and Infrastructure Services
>
TIS 2022-05-16 Item 2C - Contract - Fire Station #53 Exterior Painting with Long Painting Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 12:34:18 PM
Creation date
5/12/2022 12:27:23 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/16/22
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2021 to 2026 <br />PROJECT: Facility Improvements Project No. Various <br />DESCRIPTION: Yearly improvements and required maintenance to City facilities that are located throughout the City. <br />JUSTIFICATION: Maintenance of existing facilities and required updating and improvements. <br />STATUS: Ongoing. <br />MAINT. IMPACT: None. <br />COMMENT: Ongoing project, only one year actuals are shown in first column. <br />FINANCIAL Through Estimated <br />(in $000's) <br />2019 2020 <br />2021 2022 2023 2024 2025 2026 BEYOND TOTAL <br />EXPENSES <br />Engineering <br />4 <br />50 <br />50 <br />50 <br />50 <br />50 <br />50 <br />304 <br />Land (R/W) <br />0 <br />Construction <br />32 <br />156 <br />140 <br />150 <br />150 <br />150 <br />150 <br />150 <br />150 <br />1,228 <br />TOTAL EXPENSES <br />32 <br />160 <br />190 <br />150 <br />200 <br />200 <br />200 <br />200 <br />200 <br />1,532 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />City Oper. Revenue <br />32 <br />160 <br />190 <br />150 <br />200 <br />200 <br />200 <br />200 <br />200 <br />1,532 <br />TOTAL SOURCES <br />32 <br />160 <br />190 <br />150 <br />200 <br />200 <br />200 <br />200 <br />200 <br />1,532 <br />Facility Projects scheduled for 2021-2022 <br />TCC Exterior Paint/Stain <br />TCC Retrofit HVAC Chiller <br />City Hall Seismic Study <br />City Hall Siding Repairs <br />Fire Station 53 Exterior Paint/Stain <br />$ 140,000 2021 <br />10,000 2021 <br />40,000 2021 <br />$ 190,000 <br />100,000 2022 <br />50,000 2022 <br />$ 150,000 <br />2021 - 2026 Capital Improvement Program 47 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.