City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:27:05 PM
Creation date
8/3/2023 3:23:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The CONSULTANT will provide written responses to all the CITY's review comments that are <br />provided to the CONSULTANT following the 30 percent design submittal. <br />Deliverable(s) <br />• 30% Construction Plans (PDF Copy) <br />Plans included in this submittal: <br />- Cover Sheet, Vicinity Map, and Index <br />- General TESC, Work on Private Property Notes <br />- Legend and Abbreviations <br />- Existing Conditions and Survey Control Plans <br />- Site Preparation Plans <br />- Water Line Plan & Profile Plans <br />- Drainage Plan and Profile (if required, see Subtask 3.3) <br />- Sanitary Sewer Plan and Profile (if required, see Subtask 3.3) <br />Subtask 2.2 Sixty Percent Design Submittal <br />Quality Control <br />The CONSULTANT shall provide QC reviews for all design work prior to the 60 percent <br />submittal to the CITY if requested. <br />Compile Submittals <br />The CONSULTANT shall coordinate with all subconsultants and compile the PS&E for each of <br />the PS&E tasks. <br />Comment Review Meeting <br />The CONSULTANT will attend a one (1) hour comment resolution meeting with the CITY to go <br />through the CITY's comments, and to come to a tentative agreement on them. <br />Comment Resolution <br />The CONSULTANT will provide written responses to all the CITY's review comments that are <br />provided to the CONSULTANT following the 60 percent design submittal. <br />Deliverable(s) <br />• Written responses to the CITY's 30% review comments <br />• 60% Construction Plans (PDF Copy) <br />Plans included in this submittal: <br />- Cover Sheet, Vicinity Map, and Index <br />- General TESC, Work on Private Property Notes <br />- Legend and Abbreviations <br />- Existing Conditions and Survey Control Plans <br />- Site Preparation Plans <br />- Water Line Plan & Profile Plans <br />- Drainage Plan and Profile (if required, see Subtask 3.3) <br />- Sanitary Sewer Plan and Profile (if required, see Subtask 3.3) <br />- Paving Plan & Restoration Plans <br />- Intersection Plans <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 2012g <br />Page 3 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.